SCP-907
Unknown
~
medium confidence
SCP-907
Expected annual
$4.3M
One-time setup
$3.7M
Annual recurring
$4.2M
Personnel
12
One-time capital/setup approximately $3.72M driven by facility retrofit, specialized instrumentation, and a dedicated recovery airframe; recurring annual costs approximately $4.21M driven primarily by mission operations, personnel, and contingency/reserve requirements.
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Typical uneventful year with ~6 missions, routine maintenance, and no major incidents.
normal_mission_tempo
no_major_incidents
🚨
Minor Incident
$4.5M/yr
Small equipment damage, sample contamination requiring extra processing, or minor security breach.
equipment_damage
sample_contamination
minor_security_breach
🚨
Major Breach
$5.7M/yr
Significant containment/security breach, loss of mission data or major equipment requiring replacement and extended legal/PR response.
large_security_breach
loss_of_samples_or_instrumentation
public_exposure_requiring_response
🚨
Catastrophic Loss
$9.2M/yr
Total loss or irrecoverable damage to SCP-907 or critical unique assets, requiring program-scale replacement and extended recovery operations.
loss_of_vehicle
destruction_of_unique_instruments
major_operational_failure
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | Field researchers responsible for mission science and sample analysis. [#9] |
| Mission Controller / Operator | 3 | Operators and mission controllers for transit activation, vehicle operations and mission logistics. [#9] |
| Containment Lead | 1 | Overall containment and quarantine oversight for returned samples and compliance. [#9] |
| Security Officer / MTF Agent | 4 | 24/7 security and rapid-response coverage for Lab-3 and mission handoffs. [#9] |
| Technician / Engineer | 2 | Maintenance of vehicle, suits, drones, instrumentation and support systems. [#9] |
Confidence Notes
Ranges and midpoints derived from analyst estimates; many costs (mission frequency, catastrophic-replacement decisions, EVA-suit replacement) are scenario-dependent, producing moderate uncertainty.