SCP-9127
Euclid
~
medium confidence
SCP-9127 ("Pyroclastic Purr")
Expected annual
$4.0M
One-time setup
$102.2M
Annual recurring
$3.6M
Personnel
15
One-time capital costs are approximately $102,183,000, dominated by procurement/installation of a Class‑IV SRA; yearly operating costs are approximately $3,593,000 driven primarily by specialized staff, emergency reserves/insurance, and SRA power requirements.
One-Time Capital Costs
Total: $102.2M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal, uneventful year with routine maintenance, staffing, and consumables costs only.
no incidents
routine maintenance
scheduled testing
🚨
Minor Incident
$3.7M/yr
Small internal fire or single‑event ignition causing limited damage, medical treatment for staff, and cleanup/repairs.
localized ignition event
minor structural/expense repairs
medical treatment and decontamination
🚨
Major Breach
$8.6M/yr
Containment breach with significant damage to chamber/SRA infrastructure requiring major repairs, contractor mobilization and public‐facing mitigation.
partial SRA failure
structural damage
major cleanup and contractor mobilization
🚨
Catastrophic Breach
$53.6M/yr
Full containment loss, replacement of containment infrastructure and SRA, large legal/compensation/PR costs and possible site shutdown.
SRA total failure
public exposure
major property damage / litigation
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Handlers / Animal Technicians | 4 | [#10] 24/7 trained handlers with hazardous‑material and fire safety training (shift coverage). |
| Security Officer / MTF Agent | 4 | [#11] 24/7 on‑site guards with hazardous/fire response and lockdown capability. |
| Veterinarian | 1 | [#12] Part‑time or on‑call exotic vet with hazard pay for high‑risk interventions. |
| Engineer / SRA Technician | 3 | [#13] Certified SRA/operators and maintenance technicians for high‑power systems and on‑call repair. |
| Principal Investigator | 1 | [#14] Lead researcher overseeing testing, protocols and safety approvals. |
| Research Technician | 2 | [#14] Lab techs supporting limited experiments, monitoring and data collection. |
Confidence Notes
Many line items are present and estimated, but the Class‑IV SRA cost and frequency/severity of incidents are highly uncertain; estimates are order‑of‑magnitude and dependent on site reuse options and insurance coverage.