SCP-9130
Unknown
?
low confidence
SCP-9130
Expected annual
$16.5M
One-time setup
$37.1M
Annual recurring
$12.9M
Personnel
38
Initial one-time setup for a moderate containment program is approximately $34.45M, dominated by SRA procurement, site construction, and lab/setup costs. Recurring annual costs are about $12.88M driven primarily by staff wages, SRA maintenance, energy, reserves and ongoing research/monitoring.
One-Time Capital Costs
Total: $37.1M
Annual Recurring Costs
Total: $12.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.9M/yr
A normal operational year with routine maintenance, research, and no major incidents.
steady case load
no major SRA failures
routine research schedules
🚨
Minor Incident
$13.9M/yr
Localized incident (e.g., single-tree explosion or small SRA failure) requiring emergency response, repairs and short-term increased operations.
single SRA failure
localized tree death
medical/repair response
🚨
Major Breach
$27.9M/yr
Major containment breach affecting multiple instances or several SRA nodes, requiring large-scale repairs, replacements, legal action and temporary relocation costs.
SRA network cascade failure
multiple-tree deaths
localized evacuation
🚨
Catastrophic Breach
$112.9M/yr
Large-scale failure with mass conversion/tree death across forest tract requiring major reconstruction, large reserve drawdowns and multi-site relocation.
mass instance mortality
regional reality destabilization
full facility rebuilds
🚨
Research Breakthrough Requiring Scale Up
$22.9M/yr
Significant research breakthrough that necessitates immediate scale-up of SRA deployments and lab capacity to exploit or mitigate findings.
proof of method to communicate/control source universe
need to expand SRA grid
rapid procurement of additional labs
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#7] 24/7 perimeter and internal security staffing (armed guards, patrols). |
| Research Scientist | 8 | [#8, #13] Botanists, reality physicists, Hume specialists conducting lab and field research. |
| Engineer / Maintenance | 4 | [#5, #20] Electrical/IT/field engineers for SRA, power infrastructure and IT upkeep. |
| Field Technicians / Arborists | 6 | [#9, #19] Field culling, BONSAI crews, robotic operators and replanting teams. |
| Administrative Staff | 3 | [#17] Site admin, legal liaisons, and cover-story coordination. |
| Medical Officer | 1 | [#15] On-site medical and psychological screening support. |
Confidence Notes
Wide ranges in source estimates, heavy dependence on outbreak size (10s vs 100s of trees), uncertain SRA node counts and unquantifiable catastrophic risk make precise costing difficult; figures are moderate-site assumptions and should be re-estimated for different outbreak scales.