SCP-9245
Safe
~
medium confidence
SCP-9245
Expected annual
$2.0M
One-time setup
$11.1M
Annual recurring
$1.9M
Personnel
16
One-time setup costs are dominated by property acquisition, renovations and contingency reserves (~$11.1M total), while recurring annual costs are driven by staff wages, maintenance/spares, biohazard cleanup, taxes/insurance and administrative overhead (~$1.94M/yr).
One-Time Capital Costs
Total: $11.1M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with steady containment, regular maintenance, and no major error-fixing incidents beyond routine activity.
regular maintenance
monthly inspections
no large error-fixing events
🚨
Minor Incident
$2.0M/yr
A moderately disruptive error-fixing event causing localized launches and increased cleanup and repairs.
localized error-fixing
one-time bulk biohazard cleanup
minor property damage
🚨
Major Breach
$2.6M/yr
A significant error-fixing activation causing mass launches across multiple rooms, medical injuries, large-scale remediation and equipment replacement.
mass error-fixing activation
widespread egg dispersion
major property and equipment damage
🚨
Catastrophic Exposure
$4.9M/yr
Rare catastrophic year with political exposure, litigation, mass remediation or decision to commence shaft exploration and associated escalation costs.
public exposure
large litigation/remediation
decision to perform deep exploration/scale-up response
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#3] 24/7 perimeter security staffing to enforce two-person rule and access control (example: 10guards to staff shifts + leave). |
| CCTV Operator / Monitoring | 2 | [#4] 1–3 monitoring FTEs recommended; budget assumes 2 FTEs for continuous/archival monitoring. |
| Engineer / Maintenance | 2 | [#6] Technicians responsible for dumbwaiter network preventative maintenance, emergency callbacks and spares management. |
| Research Scientist / Lab Technician | 2 | [#9] BSL-2 technician(s) for egg handling, STR/genetic testing and sample archiving. |
Confidence Notes
Estimates are mid-range aggregations from provided analyst ranges; property acquisition and optional shaft exploration introduce the largest uncertainties, while recurring staffing and maintenance categories are better defined.