SCP-9247
Unknown
~
medium confidence
SCP-9247
Expected annual
$5.6M
One-time setup
$36.8M
Annual recurring
$5.5M
Personnel
18
Large up-front capital for an ontostatic array and site hardening (~$36.8M) with high recurring power and staffing costs driven by continuous high-strength ontostatic field and specialized personnel (~$5.47M/yr).
One-Time Capital Costs
Total: $36.8M
Annual Recurring Costs
Total: $5.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.5M/yr
Normal operational year with continuous field operation, routine maintenance, and no major incidents.
no_major_incident
continuous_containment
routine_maintenance
🚨
Minor Incident
$6.2M/yr
Localized containment incident or partial field degradation requiring emergency repairs, MTF response, and PR/cover surge.
partial_field_failure
localized_breach
media_leak_or_small_exposure
🚨
Catastrophic Field Failure
$13.5M/yr
Major ontostatic array failure or catastrophic breach requiring large-scale reconstruction, relocation, heavy MTF deployment, and drawing on contingency reserves.
total_ontostatic_array_failure
mass_rampancy_event
public_exposure
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#5] 6–10 guards plus 1–2 supervisors; aggregated to 10 total security personnel to provide 24/7 coverage. |
| Research Scientist / Clinical Staff | 2 | [#7] Two named clinical leads/handlers (Dr. Jimmison, Dr. Dwight) allocated as primary clinical staff. |
| Educator / Child-Life Specialist | 2 | [#10] On-site education & child-care staff (teachers/child-life specialists) to provide full-time educational and social programs. |
| Engineer / Maintenance | 3 | [#1, #3, #25] Field engineers and maintenance techs for ontostatic array, HVAC, electrical, and site systems. |
| Administrative Staff | 1 | [#22] Administrative/clerical FTE for clearance processing, documentation, and personnel management. |
Confidence Notes
Analyst notes provide detailed line items and ranges; estimates use midpoints and reasonable aggregations. Uncertainty remains due to wide ranges for major capital items (ontostatic array) and low-frequency high-impact failures.