SCP-9258
Euclid
~
medium confidence
Scp-9258
Expected annual
$1.2M
One-time setup
$2.4M
Annual recurring
$1.1M
Personnel
8
One-time capital and containment buildout (~$2.4M total) driven by construction, lab buildout, and a large contingency for escalation; annual operating costs ~ $1.14M driven primarily by security and scientific staff wages, specialized-team readiness, and ongoing lab/monitoring supplies.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents: ongoing containment, monitoring, staff wages and routine maintenance.
no breach
routine maintenance
normal research cadence
🚨
Minor Incident
$1.2M/yr
Limited containment breach or contamination event requiring cleanup, overtime, medical checks and legal/PR activity.
small contamination release
localized cleanup
staff exposure evaluation
🚨
Major Breach
$3.1M/yr
Significant containment failure requiring full response team deployment, temporary relocation, extensive remediation, and legal settlements.
physical breach
civilian exposure
large-scale remediation
🚨
Escalation Reclassification
$2.6M/yr
Anomalous outputs or behavior require reclassification and immediate major upgrade of containment (one-time capital expenditure) plus higher recurring operating costs.
production of hazardous mass/organics
reclassification to higher containment tier
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Continuous 24/7 guard coverage (2 per shift × 3 shifts). |
| Research Scientist | 2 | [#10] Two researchers assigned to monitoring, logging and analysis (salaries+benefits included in staff_wages). |
Confidence Notes
Estimates are compiled from analyst ranges and midpoints; many line items have wide ranges (equipment and contingency) and the anomaly's unpredictability (material production) adds uncertainty, but containment needs and staffing levels are well-understood.