SCP-9280
Unknown
~
medium confidence
SCP-9280
Expected annual
$3.5M
One-time setup
$9.3M
Annual recurring
$3.3M
Personnel
8
Initial one-time setup is sizable (~$9.3M) driven by structural stabilization, specialized equipment (sensors, UAVs, vehicles), research program seed funding, and a multi-million dollar contingency reserve. Annual operations are ~ $3.3M driven mainly by MTF readiness, ongoing research/monitoring, security wages, logistics (air/transport), medical readiness, and liaison/retainer costs.
One-Time Capital Costs
Total: $9.3M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal operational year with no activation events beyond routine maintenance, regular Protocol performance, and scheduled research.
no activation
protocol performed successfully
routine maintenance and training
🚨
Minor Incident
$4.2M/yr
Partial or localized containment failure requiring targeted MTF response, limited area control, forensic processing, amnestic deployment, and increased medical support.
localized activation event
limited replacement of SCP-9280-2 instances
partial protocol failure
🚨
Major Activation
$6.6M/yr
Large-scale activation with widespread SCP-9280-2 incidents across the 25 km radius requiring mass area control, extensive MTF deployments, broad amnestic campaigns, public health reimbursements, and major forensic operations.
widespread activation
protocol failure over extended period
mass casualties and broad public exposure
🚨
Political Exposure
$5.6M/yr
Discovery or political/diplomatic escalation (GOI infiltration discovered, regional authorities hostile) requiring emergency relocation, large contingency drawdowns, legal/PR blitz and temporary shutdown/repositioning of assets.
GOI infiltration or public exposure
hostile local authorities
cross-border diplomatic incident
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Access Control | 8 | [#7] Dedicated on-site security staff (24/7 guards and access control), estimated 6–10 FTE (midpoint 8) — staff_wages reflects these positions. |
Confidence Notes
Line-item cost ranges provided by analyst notes yield reasonable mid-point estimates for budgeting, but key uncertainties remain in activation frequency, severity distribution, and unquantified foreign-operational/legal tail risks; contingency and per-activation costs are especially uncertain.