SCP-9284 Efcháristos ~ medium confidence
SCP-9284
Expected annual
$43K
One-time setup
$56K
Annual recurring
$41K
Personnel
1
One-time setup costs are moderate (~$55.6k) driven by laboratory analyses, initial research and equipment; annual recurring operations are modest (~$41.1k/yr) driven by coordinator wages, research/monitoring, transport and contingency/reserve funds.
🏗️ One-Time Capital Costs Total: $56K
Initial Research And Lab Setup $25K
[#6, #7, #18] Starter sample collection kit; initial full chemical/biological analysis of secretion; pilot study into the musical phenomenon (sound engineer/musicologist/psychologist).
Contingency Fund $10K
[#21] Amnestic/incident contingency reserve to be funded initially.
Equipment $8K
[#2, #4, #9, #25] Transport crate and handling kit; portable surveillance & audio kit; dedicated refrigerator/freezer for short-term sample storage; archive freezer/shelving.
Medical Baseline Screening $4K
[#11] Baseline medical/allergy screening for ~20 potential handlers (one-time initial screenings).
Sop And Training Setup $3K
[#16] Initial SOP creation, training materials and rollout sessions.
Facilities $2K
[#13] Initial conservation assessment and any small structural/conservation work on the sculpture.
Sound Mitigation $2K
[#23] Portable soundproofing panels (chosen option for portability).
Database Setup $2K
[#17] Database/record-keeping system setup for rotation logs, samples and reports.
🔄 Annual Recurring Costs Total: $41K/yr
Staff Wages $12K/yr
[#1] Rotation coordination: ~0.1–0.2 FTE part-time site coordinator/administrator.
Research And Monitoring $10K/yr
[#5, #8, #10, #19, #11, #25] Data storage and monitoring maintenance; periodic re-analysis/quality checks; food-safety rapid tests when distribution approved; ongoing behavioral/music research; medical follow-up monitoring; archiving maintenance.
Emergency Response Fund $5K/yr
[#22] Annual reserve for emergency extraction, overtime, emergency transport and rapid testing.
Logistics And Transport $4K/yr
[#3] Transfer vehicle/courier costs for inter-site moves (monthly moving scenario midpoint).
Cover Story And Legal $4K/yr
[#20] Cover-story/front-company administrative costs, paperwork and minimal provenance expenses.
Facilities Maintenance $3K/yr
[#9, #13, #14, #24] Refrigerator electricity/maintenance; annual conservation/minor repairs; pest control; pro-rated room utilities/janitorial (opportunity-cost/site-space maintenance).
Supplies And Consumables $1K/yr
[#6, #12, #15] Sample collection consumables; PPE and cleaning supplies; small-scale bio/organic waste disposal.
Sop Training Refreshers $1K/yr
[#16] Annual SOP refreshers and training sessions.
Database Hosting $550/yr
[#17] Annual hosting/maintenance for the database/logging system.
Cost Scenarios
📊 Baseline (baseline) $41K/yr
93.0% probability / year
Normal, uneventful year with routine rotations, monitoring, sample collection and modest ongoing research.
routine_rotation scheduled_monitoring no_unusual_exposure
🚨 Minor Incident $61K/yr
5.0% probability / year +$20K vs baseline
Localized accidental public exposure or a small containment-related incident requiring limited amnestic treatment, emergency response overtime and extra testing.
accidental_public_viewing reported_unusual_music_in_public
🚨 Research Breakthrough Requiring Scale Up $66K/yr
2.0% probability / year +$25K vs baseline
Significant research result prompts expanded longitudinal study requiring more frequent relocations and much larger contracted research effort.
positive_research_results decision_to_scale_study
👥 Personnel 1 total
Role Count Notes
Site Coordinator / Administrator (part-time) 1 Part-time rotation coordinator (~0.1–0.2 FTE) whose salary is represented in staff_wages [#1]. Contract researchers and temporary handlers are funded under research/contracts and are not counted as permanent headcount here.
📋 Confidence Notes
Estimates were drawn directly from analyst line items with mid-point selections; many items are well-scoped (equipment, analyses) but some (frequency of moves, depth of ongoing research, contingency usage) remain uncertain, producing a medium confidence rating.
← SCP-9280 ↑ All SCPs SCP-9285 →