SCP-9292 Euclid ~ medium confidence
SCP-9292
Expected annual
$8.1M
One-time setup
$31.9M
Annual recurring
$7.4M
Personnel
30
First-year capital and setup costs are dominated by facility construction, large contingency/reserve set-asides, and property acquisition; recurring yearly costs are driven by staff wages, MTF readiness, and ongoing research/monitoring. Initial one-time spend is approx. $31.92M with ongoing operating costs of roughly $7.395M/yr.
🏗️ One-Time Capital Costs Total: $31.9M
Catastrophic Reserve $10.0M
[#30] Catastrophic cleanup / extinction-level scenario planning reserve (minimum set-aside used).
Facilities $8.8M
[#1, #2] Perimeter fencing ($750,000) and Provisional Facility 9292 compound construction/retrofit ($8,000,000).
Containment Reserve $5.0M
[#21] Emergency containment breach reserve and remediation fund (set-aside).
Initial Research And Lab Setup $2.0M
[#8] Portable/onsite laboratory buildout and specialist analytical instrumentation (mass spec, GC, microscopy, secure cold storage) – initial estimate $2,000,000.
Property Acquisition $2.0M
[#12] Purchase/long-term control of domiciles, communal buildings, easements and resident compensation ($2,000,000 used).
Power Infrastructure Initial $500K
[#3] Redundant diesel generators, UPS, transfer switches, microgrid tie-in and initial fuel storage (one-time equipment/setup).
Vehicles Purchase $500K
[#6] Armored/utility trucks, vans, ATVs/terrain vehicles and radios/GPS (purchase).
Legal Initial $500K
[#11] Initial legal/diplomatic retainer, settlements and cover-story establishment costs (initial retainer/settlement).
Insurance Reserve $500K
[#24] Insurance/liability reserve and local restitution pool (one-time reserve).
Robotics Initial $375K
[#7] Remote-handling systems, ROVs, robotic arms and MEME-safe drone hardware initial procurement (~$250k–$500k range, midpoint used).
Memetic Mitigation Setup $300K
[#10] Design/installation of memetic-isolation rooms, visual/auditory filters, SOP documentation, PPE initial stock and memetic-safety software (midpoint used).
Demolition Staging Initial $225K
[#23] Emergency demolition/heavy-equipment staging and initial portable blast-wall/berm purchases (midpoint used).
Secure Vaults Initial $200K
[#9] Secure artifact vaults and climate control initial install.
Surveillance Initial $200K
[#13] Perimeter/interior fixed PTZ cameras, thermal, seismic and biosensor hardware (initial deployment).
Long Term Research Seed $200K
[#25] Initial seed for long-term origin/investigation research program.
Decon Infrastructure Initial $150K
[#14] Full decontamination lines, hazardous-waste staging and initial disposals/PPE setup (midpoint used).
Data Systems Initial $150K
[#18] Hardened servers, encrypted communications and secure backup hardware initial deployment.
Regulatory Compliance Initial $125K
[#28] Permitting, environmental assessments and compliance reporting initial costs (midpoint used).
Media Monitoring Initial $100K
[#19] OSINT tooling, takedown automation and initial rapid-response PR setup.
Archives Initial $75K
[#29] Archives/media redaction and long-term evidence storage initial setup.
Botanical Setup Initial $40K
[#17] Botanical/wildlife containment setup (specialized containment bags, quarantine pens) initial cost.
Hazardous Disposal Initial $30K
[#22] Initial contracts/setup for hazardous/anomalous-material disposal.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $7.4M/yr
Staff Wages $3.0M/yr
[#4] Continuous on-site staffing (market-adjusted salaries, benefits, hazard pay). Budgeted as ~30 fully-loaded staff × $100k/yr = $3,000,000/yr.
Research And Monitoring $1.1M/yr
[#8, #16, #25] Lab maintenance/consumables (~$200k/yr), specialist scientific contracts/outside expertise (~$350k/yr midpoint), long-term research program recurring funding (~$500k/yr).
Mtf Deployments $1.0M/yr
[#5] Dedicated MTF rotation, training and equipment/reserve (~$1,000,000/yr).
Supplies And Consumables $800K/yr
[#15, #20] Staff food/lodging/utilities/per-diem (~$700k/yr) + lab consumables, PPE and sampling supplies (~$100k/yr).
Cover Story And Legal $300K/yr
[#11, #27] Ongoing cover maintenance, local payments and covert media/legal operations (~$200k/yr legal + ~$100k/yr cultural/community maintenance).
Memetic Mitigation Recurring $200K/yr
[#10] Amnestic production, retraining and memetic-safety consumables (~$200k/yr).
Psychological Care $150K/yr
[#26] Counseling, amnestic administration and follow-up monitoring for staff and locals (~$150k/yr).
Media Monitoring $120K/yr
[#19] OSINT monitoring, takedowns and rapid-response PR (~$120k/yr).
Power Fuel Maintenance $100K/yr
[#3] Fuel, generator maintenance and microgrid upkeep (~$100k/yr).
Vehicles Maintenance $100K/yr
[#6] Vehicle fuel, maintenance and repairs (~$100k/yr).
Surveillance Maintenance $100K/yr
[#13] Monitoring center staffing, sensor telemetry and repairs (~$100k/yr).
Hazardous Disposal Contracts $80K/yr
[#22] Recurring hazardous disposal and anomalous-material neutralization contracts (~$80k/yr or per-event fees higher).
Decontamination Maintenance $75K/yr
[#14] Consumables, waste disposal contracts, incineration/contract fees (~$50–100k/yr, midpoint used).
Data Systems Maintenance $75K/yr
[#18] Cybersecurity monitoring, backups and comms maintenance (~$75k/yr).
Botanical Program $60K/yr
[#17] Ongoing botanical/wildlife containment and study program (~$60k/yr).
Robotics Support $50K/yr
[#7] Spare parts, software support and service contracts for remote-handling and drones (~$50k/yr).
Demolition Rentals $50K/yr
[#23] Heavy-equipment rental pool and readiness (~$50k/yr).
Vaults Maintenance $30K/yr
[#9] Monitoring and maintenance for secure vaults (~$20–40k/yr, midpoint used).
Regulatory Compliance Maintenance $30K/yr
[#28] Ongoing compliance reporting and mitigation (~$20–40k/yr, midpoint used).
Archives Maintenance $25K/yr
[#29] Maintenance of redacted archives and long-term evidence storage (~$25k/yr).
Facilities Maintenance $0/yr
[]
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $7.4M/yr
86.5% probability / year
Normal operational year with routine research, maintenance, and no major incidents.
regular operations scheduled research routine maintenance
🚨 Minor Incident $7.9M/yr
10.0% probability / year +$500K vs baseline
Localized containment breach or hazardous exposure requiring additional MTF/medical response and short-term remediation.
small artifact escape localized contamination single-structure damage
🚨 Major Breach $22.4M/yr
3.0% probability / year +$15.0M vs baseline
Significant containment failure affecting multiple artefacts/structures requiring large-scale remediation, reconstruction, and extended deployments.
multi-artifact interaction widespread contamination extended multi-week MTF operations
🚨 Catastrophic Breach $47.4M/yr
0.5% probability / year +$40.0M vs baseline
Low-probability, high-impact scenario (wide-area catastrophic effects) requiring extreme remediation, potential evacuation and long-term recovery.
extinction-level anomalous effect uncontrolled spread national-level exposure
👥 Personnel 30 total
Role Count Notes
Site Director / Lead Researcher 1 [#4] Lead researcher / site director (1).
Senior Researcher / Expert 3 [#4] Senior experts / leads (3).
Research Scientist / Technician 7 [#4] Research staff and technical personnel (approx. 7, scaled to budget).
Security Officer / MTF Agent 14 [#4] Security staff to provide 24/7 coverage (scaled from example to match budgeted headcount).
Medical Officer / Decon Tech 3 [#4] Medics and decontamination technicians (approx. 3).
Logistics / Support Staff 2 [#4] Logistics and support personnel (approx. 2).
📋 Confidence Notes
Notes provide detailed itemized estimates for most line items, but the anomalous nature of SCP-9292 and wide uncertainty around breach probabilities, remediation complexity, and long-term research scale reduce certainty; hence medium confidence.
← SCP-9288 ↑ All SCPs SCP-9293 →