SCP-9320
Unknown
✓
high confidence
SCP-9320
Expected annual
$5.0M
One-time setup
$6.6M
Annual recurring
$4.9M
Personnel
33
Initial capitalization is approximately $6.56M driven primarily by outpost construction, bespoke sensors/compute, and contingency; ongoing annual operations are about $4.91M driven by staff salaries, ML/cloud costs, security, and travel/fieldwork.
One-Time Capital Costs
Total: $6.6M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal operational year with no major incidents; routine maintenance, research, and scheduled activities.
no major incidents
standard research cadence
routine maintenance
🚨
Minor Incident
$5.1M/yr
Localized equipment failure or sensor loss requiring expedited replacement and emergency field mobilization.
sensor failure
localized storm damage
emergency helicopter charter
🚨
Major Breach
$6.4M/yr
Severe event (wildfire, flood, major structural damage) causing significant loss of infrastructure and extended outage.
wildfire
major flooding
catastrophic equipment loss
🚨
Political Exposure
$5.4M/yr
Public disclosure or legal action following partial publication leading to elevated legal, PR and remediation costs.
media attention
lawsuit or FOIA pressure
NPS disputes
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 12 | [#4] Senior leads and supporting scientists (linguistics, biology, sophontology) and associated research staff. |
| Data Scientist / Engineer | 3 | [#12, #11] ML engineers and data scientists responsible for model training, pipelines and compute operations. |
| Annotation Workforce / Translators | 5 | [#5, #6] Human annotators and linguistic assistants (initial and ongoing annotation staffing). |
| Security Officer / MTF Agent | 8 | [#14, #15] On-site guards (rotating shifts) and related security staffing and equipment. |
| Engineer / Maintenance | 2 | [#9, #17] Technical maintenance staff for sensors, power systems and routine servicing. |
| Administrative Staff | 2 | [#25, #30] Program management, finance, HR and procurement support. |
| Site Director / Executive Staff | 1 | [#4] Site lead / research head responsible for oversight and approvals. |
Confidence Notes
Analyst notes provide line-item estimates for nearly every capital and operating expense, permitting a detailed cost build; remaining uncertainty is standard contingency for environmental risks and anomalous scaling.