SCP-9321
Unknown
?
low confidence
SCP-9321
Expected annual
$680K
One-time setup
$3.5M
Annual recurring
$590K
Personnel
9
Estimated one-time project costs are approximately $3.54M driven primarily by tetrapod removal/coastal engineering, demolition/heavy equipment and contingency/compensation; recurring annual costs are about $590k driven by security and ongoing research/monitoring.
One-Time Capital Costs
Total: $3.5M
Annual Recurring Costs
Total: $590K/yr
Cost Scenarios
📊
Baseline
(baseline)
$590K/yr
Normal year with scheduled monitoring, routine maintenance and no anomalous escalation or major incidents.
regular monitoring
no regrowth
stable containment
🚨
Minor Incident
$740K/yr
Localized regrowth or containment failure requiring emergency neutralization, overtime, extra hazardous disposal and short-term repairs.
localized regrowth
small containment breach
public complaint requiring response
🚨
Major Breach
$1.8M/yr
Significant regrowth or structural failure requiring large-scale coastal works, replacement tetrapods, major remediation and large compensation payments.
rapid tetrapod regrowth
structural collapse
extensive environmental damage
🚨
Political Exposure
$1.1M/yr
High-profile legal or public exposure forcing accelerated settlements, extended monitoring and sustained PR/legal operations.
media/legal exposure
NGO/government intervention
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#5] Four guards (typical staffing for 24/7 perimeter security as described; wages included in staff_wages). |
| Research Scientist | 2 | [#12] Laboratory researchers for sequencing, assays and follow-up studies (part of recurring research costs). |
| Engineer / Maintenance | 1 | [#6,#7,#8] Civil/containment engineer responsible for demolition oversight, heavy-lift coordination and coastal remediation support. |
| Medical Officer | 1 | [#13] Medical surveillance and decontamination lead for crew health checks and emergency response. |
| Administrative Staff | 1 | [#2,#16,#28] Admin/legal liaison handling permits, PR/cover coordination and final audit/handover logistics. |
Confidence Notes
Estimates are low-confidence due to wide ranges in analyst notes, anomalous biological behaviour, location-specific permitting/contractor variability, and uncertainty around tetrapod removal scope and compensation amounts.