SCP-936
Euclid
~
medium confidence
SCP-936
Expected annual
$699K
One-time setup
$279K
Annual recurring
$696K
Personnel
10
One-time setup approximately $279,000 (dominated by incinerator, lab setup/initial research and contingency); annual recurring costs approximately $695,680/yr driven mainly by security staffing, D-Class housing/transport overhead, ongoing research, and liability reserve.
One-Time Capital Costs
Total: $279K
Annual Recurring Costs
Total: $696K/yr
Cost Scenarios
📊
Baseline
(baseline)
$696K/yr
Normal year with no uncontained incidents; routine operations only.
no_incidents
routine_maintenance
scheduled_research
🚨
Minor Incident
$716K/yr
Single localized uncontained specimen requiring emergency response, incineration and soil remediation.
single_uncontained_specimen
contractor_response
soil_remediation
🚨
Major Breach
$1.2M/yr
Larger containment failure or spread requiring wide eradication, substantial remediation and legal response.
multiple_uncontained_specimens
rapid_spread
public_exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] Continuous perimeter/site guards; 2 on duty 24/7 implies ~6 hires; wages included in staff_wages. |
| Research Scientist | 1 | [#11] Supervising botanist/biologist (0.5 FTE allocated in salary budget). |
| Lab Technician | 1 | [#11] Lab technician (0.5 FTE allocated in salary budget). |
| D-Class Personnel | 2 | [#7, #8] Two D-Class personnel required per monthly harvest/screening event; D-Class wages and housing/overhead included in staff_wages and logistics. |
Confidence Notes
Analyst notes provide detailed practical estimates for most line items (wages, equipment midpoints, recurring budgets), but several items (choice of incinerator vs off-site disposal, emergency equipment purchase vs contractor retainer, frequency of incidents) are conditional and introduce uncertainty, so confidence is medium.