SCP-9363
Euclid
~
medium confidence
SCP-9363
Expected annual
$4.1M
One-time setup
$10.5M
Annual recurring
$4.0M
Personnel
42
Estimated startup/one-time costs are approximately $10.5M driven primarily by civil works (subsurface shaft excavation/stabilization, dewatering systems), site establishment in swamp conditions, and specialized instrumentation; annual recurring operations are ~ $4.0M/yr dominated by 24/7 security and research/staff wages.
One-Time Capital Costs
Total: $10.5M
Annual Recurring Costs
Total: $4.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.0M/yr
Normal operational year with no major incidents; steady containment and monitoring.
routine_operations
no_structural_incident
no_public_exposure
🚨
Minor Incident
$4.2M/yr
Localized incident: small breach, flooding event, or limited civilian intrusion requiring response/repairs.
localized_flooding
civilian_intrusion
minor_structural_repair
🚨
Major Breach
$5.5M/yr
Significant containment breach or structural failure requiring heavy civil remediation, mass amnestic/cleanup, or temporary site relocation.
shaft_failure
major_flood_event
large-scale_public_exposure
🚨
Catastrophic Breach
$9.0M/yr
Severe anomalous event or public exposure requiring site evacuation, major national-level cover-up, or long-term relocation of artifacts.
widespread_exposure
structural_collapse_with_casualties
national_media_attention
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#2] Frontline perimeter guards covering 24/7 shifts to patrol the 1 km isolating perimeter. |
| Security Supervisor | 3 | [#2] Shift supervisors and senior security leads. |
| Research Scientist | 3 | [#12] Senior researchers studying SCP-9363, artifacts and mitigation strategies. |
| Research Technician / Lab Tech | 5 | [#12, #10] Lab technicians handling sampling, equipment and routine analysis. |
| Conservator | 1 | [#12, #13] Artifact conservator responsible for handling and storage protocols for recovered items. |
| Site Director / Executive Staff | 1 | [#3, #2] Single senior manager overseeing provisional Site-9363 operations and liaison with HQ. |
| Engineer / Maintenance | 2 | [#4, #5, #6] Civil/technical staff for shaft monitoring, pumps/generators maintenance and infrastructure upkeep. |
| Medical Officer | 1 | [#20, #11] On-site medical support for wound/contamination response and treatment during incidents. |
| Administrative Staff | 2 | [#15, #24] Logistics, cover-story administration, permits and records management. |
Confidence Notes
Detailed analyst notes provide solid technical cost drivers (civil works, staffing), but uncertainty remains around subsurface conditions, anomalous behavior and frequency/severity of incidents, producing moderate confidence.