SCP-940
Keter
~
medium confidence
SCP-940
Expected annual
$62.5M
One-time setup
$239.2M
Annual recurring
$57.5M
Personnel
111
Initial capital outlay is dominated by purpose-built BSL-4 large-animal facilities, mass-manufacture/integration setup, and a large contingency reserve (~$239M one-time). Recurring costs (~$57.5M/yr baseline) are driven by specialized staff (security/MTF/research/medical), covert cover-up/legal programs, R&D and surveillance, and contingency top-ups.
One-Time Capital Costs
Total: $239.2M
Annual Recurring Costs
Total: $57.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$57.5M/yr
Normal operational year with no major containment incidents; ongoing research, surveillance, routine field operations and cover-up activities only.
no major breach
routine surveillance detections
scheduled R&D and maintenance
🚨
Minor Incident
$65.5M/yr
Localized outbreak or containment failure requiring increased MTF deployments, expanded field decontamination, surge medical care, and elevated legal/cover-up spending.
small community outbreak
single-site breach
localized environmental contamination
🚨
Major Breach
$257.5M/yr
Large-scale multi-site outbreak or escape of adult specimens requiring mass remediation, national-level interventions, and heavy use of contingency reserves (incineration, mass evacuations, legal settlements).
widespread endemicity
multi-site coordinated breach
failure of covert insecticide integration
Personnel
111 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (site guards) | 40 | [#5] 24/7 armed perimeter and on-site security staffing for dedicated containment wing; higher staffing ratios assumed. |
| Mobile Task Force (field operators) | 25 | [#6] Dedicated MTF team for detection, capture, disposal and evacuations; includes operators, medics and specialized technicians. |
| Research Scientist | 12 | [#10, #13] Research staff for antiparasitic development, diagnostics and ongoing monitoring. |
| Medical Officer / ICU Staff | 8 | [#9, #14] BSL-4 medical staff for infectee treatment, sedation and ICU care. |
| Engineer / Maintenance | 6 | [#1, #4, #20] Facility engineers and maintenance personnel for HVAC, negative-pressure systems, generators and telemetry. |
| Technician / Lab Staff | 8 | [#2, #13, #24] Lab technicians for diagnostics, specimen maintenance, sequencing and husbandry. |
| Administrative Staff | 10 | [#26] Procurement officers, compliance, record-keeping, and covert program managers. |
| Site Director / Executive Staff | 2 | [#1, #26] Senior oversight and executive coordination for containment program. |
Confidence Notes
Estimates draw from analyst-provided ranges but many items are scenario-dependent (incident frequency, geographic scale, covert operations). Capital costs for specialized large-animal BSL-4 facilities and contingency sizing are particularly uncertain; recurring program costs are better-constrained but still vary widely with political/operational choices.