SCP-9409
Safe
~
medium confidence
SCP-9409
Expected annual
$24.3M
One-time setup
$345.3M
Annual recurring
$23.6M
Personnel
115
Upfront capital is large (~$345.3M) driven primarily by a regional environmental/hydrology engineering program and subterranean construction; annual operating costs are ~ $23.6M/yr dominated by staff wages, ongoing research/monitoring, and covert cover/legal operations.
One-Time Capital Costs
Total: $345.3M
Annual Recurring Costs
Total: $23.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$23.6M/yr
Routine year with no major incidents; normal operations, research, cover maintenance and scheduled maintenance only.
no large-scale breaches
regular research cadence
standard maintenance
🚨
Minor Incident
$25.1M/yr
Localized wildlife siege or equipment damage requiring extra ammo, short repairs, and limited emergency response.
localized perimeter breach
warren discovery requiring offensive missions
🚨
Major Breach
$43.6M/yr
Significant coordinated wildlife assault or containment breach causing major damage to surface infrastructure and requiring heavy repairs, replacement equipment, and extended emergency response.
massive perimeter breach
destruction of pumping/packaging infrastructure
widespread equipment loss
🚨
Political Exposure
$33.6M/yr
Discovery or partial exposure of municipal injections/cover operations leading to legal actions, large settlements, and increased covert operations spending.
media/legal discovery
municipal investigation
public litigation
Personnel
115 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 50 | [#8] Minimum garrison of 50 security personnel required on-site at all times. |
| Research Scientist | 20 | [#9] Example staffing includes ~20 scientists for operations and research. |
| Technician / Operator | 30 | [#9] Technical staff to operate pumps, packaging, and field operations (~30 technicians/operators). |
| Administrative Staff | 10 | [#9] On-site management and administrative personnel (~10 admins). |
| Monitoring Operator | 5 | [#12] CCTV/perimeter monitoring staff (example: 5operators). |
Confidence Notes
Analyst notes provide ranges and concrete examples for many line items, allowing reasonable mid-point estimates for staffing and equipment; however the large uncertainty in scope (size of Inclusion Zone, number of municipal hookups, and whether the environmental program scales to regional/global works) reduces overall confidence.