SCP-9430
Pending
?
low confidence
SCP-9430
Expected annual
$11.5M
One-time setup
$124.1M
Annual recurring
$11.3M
Personnel
33
Initial capital investment is large (~$124.1M) driven by construction of remote containment and large contingency reserves; ongoing annual operation costs are substantial (~$11.29M/yr) driven by staff wages, remote facility operations, insurance, and covert lease/monitoring expenses.
One-Time Capital Costs
Total: $124.1M
Annual Recurring Costs
Total: $11.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.3M/yr
Routine monitoring and operations with no major incidents; normal maintenance, leases, staff wages and research continue.
no_withdrawals
normal_maintenance
routine_research
🚨
Minor Incident
$11.8M/yr
Small-scale operational incident (e.g., intercepted withdrawal that requires extra ops, minor legal settlement or equipment replacement).
unauthorised_withdrawal
failed_intercept
small_settlement
🚨
Major Breach
$21.3M/yr
Containment breach or significant mishandling leading to localized damage and substantial remediation, legal settlements and diplomatic costs.
breach_of_SCP-9430-1
local_collapse
large_settlement_and_cleanup
🚨
Catastrophic Breach
$86.3M/yr
Major catastrophic event (topological collapse with ~3 km damage radius) requiring massive remediation, rebuilding and potential political fallout.
full_topological_collapse
mass_casualty_cleanup
major_diplomatic_liability
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Analyst | 4 | [#7] 24/7 CCTV and shipping monitoring analysts. |
| Field Operative / MTF Agent | 8 | [#8] Operatives for intercepts, covert deliveries and rapid response. |
| Research Scientist | 8 | [#17] Theoretical/computational physics team and associated postdocs for modelling and containment research. |
| Conservator | 2 | [#19] Art conservation and materials specialists for SCP-9430-2 handling and analysis. |
| Remote Facility Security / Maintenance | 10 | [#16] On-site staff for remote containment facility operations, security, power and environmental control. |
| Administrative Staff / Data Analyst | 1 | [#20] Document control, data analysis and administrative support. |
Confidence Notes
Large uncertainties due to anomalous behavior, jurisdictional/legal complexity and wide cost ranges in analyst notes; many contingency values are judgment calls.