SCP-9449
Euclid
~
medium confidence
SCP-9449
Expected annual
$2.8M
One-time setup
$7.5M
Annual recurring
$2.7M
Personnel
8
Estimated initial capital (one-time) costs are approximately $7.50M driven by secure subterranean construction, BSL-2/3 lab buildout, hazardous-disposal capability, insurance/reserve and specialized equipment; annual operating costs are approximately $2.74M driven by dedicated security, senior-researcher oversight, ongoing research/lab operations, emergency response readiness, and insurance/legal budgets.
One-Time Capital Costs
Total: $7.5M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal year with no major incidents; routine operations, monitoring, and scheduled disposals.
no_breach
routine_research_and_disposal
scheduled_transport_events
🚨
Minor Incident
$2.8M/yr
Small containment incident (e.g., gauntlet tampering, single unauthorized duplicate) requiring emergency response, limited disposal/forensic work and minor repairs.
gauntlet_failure_or_tampering
unauthorized_single_duplicate
minor_equipment_damage
🚨
Major Breach
$3.9M/yr
Significant breach or discovery that duplicates biological or hazardous materials requiring BSL-3/4 escalation, larger disposal operations, legal action, and temporary facility upgrades.
duplicate_is_biological_or_hazardous
failure_of_quarantine_protocols
need_for_lab_scale-up_or_external_support
🚨
Catastrophic Breach
$10.0M/yr
Large-scale uncontrolled release, public exposure, or duplicate proliferation triggering full decommissioning, litigation, site remediation, and major replacement containment.
mass_duplicate_release
public_exposure_or_political_exposure
loss_of_primary_containment
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#6] Dedicated 24/7 security detail with two-person minimum and shift coverage (4–6 recommended; 6 used to ensure overlap). |
| Research Scientist / Senior Researcher | 2 | [#7] Two named senior researchers required for authorizations and incident decisions (on-call coverage; salaries included in staff_wages). |
Confidence Notes
Line items and ranges were provided for most categories allowing mid-point estimates, but significant uncertainties remain (on-site disposal vs contract, frequency of transports/incidents, potential for BSL-4 escalation) so overall confidence is medium.