SCP-946
Euclid
?
low confidence
SCP-946
Expected annual
$4.0M
One-time setup
$10.5M
Annual recurring
$3.8M
Personnel
24
One-time setup and contingency seed funding dominate initial costs (~$10.46M), while recurring annual costs are driven by staff salaries, research/experiments and contingency replenishment (~$3.80M/yr). Main drivers are personnel (monitoring, security, researchers), experiment budgets, and contingency reserves.
One-Time Capital Costs
Total: $10.5M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal year with routine monitoring, research, and no major containment manifestations.
no manifestation beyond routine debates
regular experiments and maintenance
🚨
Minor Incident
$4.0M/yr
Localized manifestation or small-scale leak requiring targeted emergency response, amnestic administrations, PR response and minor repairs.
small manifestation of debated hypothetical
limited public exposure or property damage
🚨
Major Manifestation
$13.8M/yr
Significant debated hypothetical manifests at scale causing public exposure, casualties or major infrastructure damage requiring large-scale amnestic operations, reparations and contingency fund drawdown.
large-scale manifestation
public exposure / mass-casualty scenario
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Front-line armed guards for 24/7 site security (2 per shift, 3 shifts). |
| Security Supervisor | 1 | [#7] Supervisory staff for security shift oversight. |
| Security Monitor / Video Analyst | 6 | [#5] Continuous video/audio monitoring staff (2 per shift, redundancy). |
| Research Scientist | 4 | [#13] Dedicated research team (1 senior, 2 junior, 1 support/technician). |
| On-call Debater / Rhetorician | 2 | [#6] Trained rhetoricians to join/steer debates as containment control. |
| Medical Officer / Psychiatrist | 2 | [#10] On-call medical and psychiatric support for observers and staff. |
| Systems Administrator / IT | 1 | [#18] Dedicated IT/sysadmin resource for hardened infrastructure and audits. |
| Administrative Staff | 2 | [#28, #19] Recordkeeping, redaction processing and administrative overhead. |
Confidence Notes
Estimates are based on analyst ranges and midpoints but the object's unpredictable, reality-altering effects and very wide contingency ranges introduce high uncertainty; many major costs depend on risk appetite and chosen seed levels.