SCP-9474
Euclid
~
medium confidence
SCP-9474
Expected annual
$30.1M
One-time setup
$320.5M
Annual recurring
$28.4M
Personnel
33
Initial capital and contingency reserves dominate one-time costs (~$320.5M), while ongoing annual costs are driven by high-skill personnel, secure HPC/storage operations, and legal/cover-up operations (~$28.4M/year).
One-Time Capital Costs
Total: $320.5M
Annual Recurring Costs
Total: $28.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$28.4M/yr
Normal, uneventful year with standard operations and no major incidents.
no_public_discovery
steady_research_and_monitoring
🚨
Minor Incident
$31.1M/yr
Localized leak or small publication leading to targeted takedowns, extra legal work and limited covert interventions.
small_data_leak
preprint_publication
independent_replication_attempt
🚨
Major Breach
$160.9M/yr
Widespread public discovery requiring large-scale PR/legal remediation and activation of contingency funds for suppression/remediation.
major_publication
mass_media_exposure
failed_covert_containment
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Computational Physiologist | 10 | [#6] Core analytics research staff modeling NOUMENON and interpreting outputs. |
| Data Scientist | 6 | [#6] Data ingestion, cleaning, cohort analysis and statistical validation. |
| Software Engineer | 6 | [#6] Model engineering, infrastructure code, tooling and deployment. |
| Operations / HPC Administrator | 4 | [#6] HPC/sysadmin staff managing air-gapped cluster, backups and maintenance. |
| Biostatistician | 3 | [#6] Domain experts for physiological model validation and study design. |
| Administrative Staff | 2 | [#6] Program management, scheduling, procurement support. |
| Medical Officer / Clinical Monitor | 1 | [#6] Clinical oversight for any controlled human-subject sandboxing. |
| Security / Access Coordinator | 1 | [#6] Local access control and liaison for vetting/clearance processes. |
Confidence Notes
Analyst notes provide detailed line items and plausible ranges for each cost, enabling mid-point estimates; however many items (legal/interdiction, contingency reserves, and covert operations) are highly variable and jurisdiction-dependent, so overall confidence is medium.