SCP-949
Safe
~
medium confidence
SCP-949
Expected annual
$6.0M
One-time setup
$9.5M
Annual recurring
$5.7M
Personnel
37
Estimated one-time setup and capital costs are approximately $9.46M, driven by land acquisition, construction, fencing, vehicles and contingency reserves. Recurring annual operations are roughly $5.74M/yr, dominated by security and research staffing, logistics (airlift/vehicle operations) and ongoing maintenance/consumables.
One-Time Capital Costs
Total: $9.5M
Annual Recurring Costs
Total: $5.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.7M/yr
Normal operational year with no major incidents; routine maintenance, staffing and monitoring.
routine_operations
scheduled_missions
no_major_relocations
🚨
Minor Incident
$5.9M/yr
Localized breach or structural damage requiring repairs, additional amnestics and limited legal actions.
localized_breach
minor_structural_damage
small_civilian_exposure
🚨
Relocation Event
$6.5M/yr
SCP-949 disappears/reappears requiring rapid redeployment, re‑erection of fencing, equipment replacement and higher transport/airlift usage.
park_relocation
rapid_redeployment
equipment_replacement
🚨
Major Breach
$10.7M/yr
Significant exposure or widely visible incident requiring large‑scale amnestics, national PR buys, settlements and major containment operations.
widespread_exposure
major_media_attention
litigation_or_settlements
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#3] 24 guards (accounts for 3 shifts, rotation, leave and supervisors) to maintain 4‑person patrol groups. |
| Research Scientist / Technician | 8 | [#12] Science staff responsible for anomaly study and exploration (part of research team staffing). |
| Level-4 Approver | 2 | [#12] Two Level‑4 personnel for approvals and oversight. |
| Medical Officer / EMT / Clinic Staff | 3 | [#23] On‑site medical staff to support personnel and D‑class injuries. |
Confidence Notes
Notes are detailed and allow a mid‑range estimate, but land acquisition price variability, uncertain relocation frequency and choice of contingency/reserve sizes introduce material uncertainty.