SCP-953
Keter
~
medium confidence
SCP-953
Expected annual
$2.7M
One-time setup
$4.7M
Annual recurring
$2.6M
Personnel
17
Estimated first-year capital/setup costs are approximately $4.72M driven by containment construction, specialized equipment/robotics, and a large breach/rebuild reserve; ongoing annual costs are roughly $2.58M driven primarily by security wages, research staff, dog-care/consumables, and contingency/cover-up allocations.
One-Time Capital Costs
Total: $4.7M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal, uneventful year with no major incidents; routine containment operations, staffing, consumables, and scheduled maintenance only.
no escape attempts
scheduled maintenance and drills
normal transport/activity
🚨
Minor Incident
$2.7M/yr
Localized containment breach or attempted escape requiring rapid-response activation, limited cleanup, a small number of transports, and localized PR/legal actions.
attempted escape contained quickly
localized biological contamination
limited media exposure
🚨
Major Breach
$5.6M/yr
Significant containment failure requiring major rebuild, large-scale cleanup, substantial PR/legal expenditures, and rapid replacement of destroyed infrastructure.
catastrophic containment breach
extensive infrastructure damage
major public exposure requiring large-scale cover-up
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#12] Twelve dedicated guards to cover three 8-hour shifts (salaries included in staff_wages estimate). |
| Research Scientist | 2 | [#17] Two senior researchers included in research_and_monitoring budgets. |
| Research Technician | 2 | [#17] Two technical staff supporting experimental and model work. |
| Veterinarian | 1 | [#17] One on-site veterinarian to manage canine health and subject interactions. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing midpoint estimates; however SCP anomalous behavior and wide ranges for many items (reserves, incident costs, staffing mixes) introduce material uncertainty.