SCP-9700
Safe
~
medium confidence
SCP-9700
Expected annual
$3.2M
One-time setup
$6.7M
Annual recurring
$2.8M
Personnel
4
One-time startup costs are estimated at $6,655,000 driven primarily by surge/reserve funding and initial site/vault construction; ongoing annual operations are estimated at $2,814,050/yr driven by specialist staff, per-new-site response spending, and contractor/field deployment costs.
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with routine operations, no major incidents or escalations.
routine map processing
scheduled field deployments
no containment failures
🚨
Minor Incident
$3.0M/yr
Localized containment incident or single-site emergency requiring emergency repairs, extra deployments and one-off cover payments.
single-site containment breach
emergency reconstruction
one-off legal/cover payments
🚨
Major Breach
$4.8M/yr
Significant structural breach or hazardous discovery requiring engineered containment, extended field operations and major contracting.
engineered containment required
multi-week field operation
large contractor engagement
🚨
Catastrophic Breach
$22.8M/yr
Simultaneous multi-site escalations or discovery of high-complexity anomalies requiring program-scale surge response and major capital outlays.
multiple simultaneous sites
international logistics surge
full containment facility construction
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Conservator / Archivist | 1 | [#6] Responsible for paper conservation, storage and handling. |
| GIS Analyst | 1 | [#6] GIS integration, georectification and database management. |
| Cartographer / Historian | 1 | [#6] Map analysis, provenance research and historical context. |
| Research Scientist / Program Manager | 1 | [#6] Oversees studies, coordinates field responses and manages research projects. |
Confidence Notes
Notes provide detailed line-item ranges, but per-site and per-map variability is large and surge scenarios are highly uncertain; estimates use mid-range assumptions for a modest regional program.