SCP-9720
Thaumiel
~
medium confidence
SCP-9720
Expected annual
$2.9M
One-time setup
$3.7M
Annual recurring
$2.9M
Personnel
21
Initial capital and lab/R&D setup drives one-time cost (~$3.74M), while recurring payroll (research + containment + security), contingency reserves and legal/operational budgets drive annual costs (~$2.86M).
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal operational year with routine use, scheduled missions, and no major containment incidents.
routine_operations
scheduled_missions
no_major_breach
🚨
Minor Incident
$3.0M/yr
Localized quarantine event or small containment issue requiring extra handling, legal work, and limited MTF support.
single_stamped_output
localized_quarantine
limited_mtf_assistance
🚨
Major Breach
$4.4M/yr
Cascading dereferentialization or unauthorized access leading to widescale containment response, emergency construction, and mass memory management.
unauthorized_access
cascading_dereferentialization
mtf_deployment
🚨
Political Exposure
$3.9M/yr
Information leak or legal exposure from Thaumiel operations requiring heavy legal defense, settlements, and reputational mitigation.
leak_or_exposure
foia_requests
legal_challenges
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Archivist | 4 | [#5] Trained archivists required for approved activations and records handling (roster to cover shifts/leave). |
| Surrealistics Officer | 3 | [#5] Surrealistics specialists to supervise activations and interpret memetic effects. |
| Security Officer / MTF Agent | 6 | [#6] Site security and escort staffing to enforce access protocols and custody transfers (shift coverage). |
| Research Scientist | 4 | [#13, #25] PI + research team working on dereferentialization mechanisms and countermeasures (lab personnel). |
| Lab Technician | 2 | [#13] Technical support for Surrealistics lab equipment, consumables, and sample handling. |
| Administrative Staff | 2 | [#23] Scheduling, approvals, access committee support and thaumiel ops coordination. |
Confidence Notes
Notes are derived from explicit analyst ranges; physical construction and equipment costs are well-bounded but memetic/operational variables (incident frequency, scope of MTF activations, mission tempo) are uncertain, producing moderate confidence.