SCP-9814
Unknown
~
medium confidence
SCP-9814
Expected annual
$15.9M
One-time setup
$5.4M
Annual recurring
$15.3M
Personnel
14
One-time facility construction and installation costs are modest (~$5.4M), while the dominant ongoing cost is annual procurement and handling of 7 mm tungsten plating (~$10M/yr baseline). Other recurring costs (staff, maintenance, transport, contingencies, and research) bring baseline annual operating costs to roughly $15M/yr.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $15.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.3M/yr
Normal year with scheduled annual plate replacement and routine operations (walls-only tungsten lining).
scheduled_plate_replacement
routine_operations
🚨
Minor Incident
$18.0M/yr
Accidental activation or equipment failure during plate replacement causing moderate facility damage and medical costs.
plate_replacement_error
unexpected_activation
equipment_failure
🚨
Full Coverage Requirement
$40.0M/yr
Conservative engineering decision or regulatory mandate forces full-coverage tungsten lining (walls+ceiling+floor) increasing annual tungsten procurement drastically.
safety_review
policy_change
tungsten_price_or_supply_shock
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#12] 24/7 armed security coverage and perimeter control; shift staffing estimated to meet the security budget portion. |
| Site Security Manager | 1 | [#12] On-site security management and liaison duties. |
| Research Scientist | 1 | [#13, #18] Senior containment scientist / lead responsible for anomaly behavior and research oversight. |
| Engineer / Maintenance | 1 | [#5, #11, #22] Responsible for hoists, HVAC, fire systems, and structural absorber maintenance. |
| Technician (remote operations) | 2 | [#4, #7] Technicians for plate replacement operations, rigging, remote tooling, sensor maintenance. |
| Administrative Staff | 1 | [#19, #20] Site administration, logistics coordination, and compliance paperwork. |
Confidence Notes
Estimates rely on commodity (tungsten) price ranges, engineering assumptions about room geometry, and analyst mid-range choices. One-time items are better constrained; recurring tungsten procurement is the largest uncertainty, so overall confidence is medium.