SCP-9835
Safe
~
medium confidence
SCP-9835
Expected annual
$7.3M
One-time setup
$8.0M
Annual recurring
$7.1M
Personnel
22
Up-front acquisition, structural remediation and secure vault buildout drive one-time costs (~$8.0M), while ongoing security, international investigations and monitoring dominate recurring annual costs (~$7.11M). Major incident response could add multi-million-dollar spikes in affected years.
One-Time Capital Costs
Total: $8.0M
Annual Recurring Costs
Total: $7.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.1M/yr
Normal year with stable containment, steady patrols, monitoring and routine operations; no major incidents.
no reactivation
routine maintenance
scheduled investigations
🚨
Minor Incident
$8.8M/yr
Localized reactivation or small breach requiring emergency deployment, short-term detentions, salvage and targeted remediation.
localized anomalous activity
small structural collapse
field arrests of GoI personnel
🚨
Major Breach
$18.6M/yr
Significant reactivation or multi-site exposure requiring large-scale acquisition, international response, sustained research surge and mass detention/containment.
large-scale reactivation
multiple associated sites discovered
hostile memetic propagation
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#3] Continuous perimeter patrol detachment (~12 operatives to maintain 24/7 coverage). |
| Surveillance Analyst / Operator | 4 | [#5, #6] Analysts/operators for camera/sensor network and drone operations (3–6 estimated; midpoint used). |
| Research Scientist | 4 | [#12] Dedicated scientists for monitoring and recurrence-detection research; staffing reflected in research budget. |
| Administrative Staff | 1 | [#17] Single administrative/legal coordinator to manage cover-story, permits and liaison. |
| Medical Officer | 1 | [#27] On-call medical/psychological provision primarily budgeted under medical services. |
Confidence Notes
Notes provide detailed line-item ranges for most categories, but several large ranges and contingency on unknown associated sites leave substantial uncertainty; mid-range estimates used for budgeting.