SCP-9902
Keter
~
medium confidence
SCP-9902
Expected annual
$21.3M
One-time setup
$155.3M
Annual recurring
$20.0M
Personnel
92
Large one-time capital expenses (property buyouts, site build-outs, and contingency reserves) dominate upfront costs (~$155M), while ongoing operations (security, continuous hourly-generation handling, research, logistics, medical surveillance, and hazardous-waste management) drive recurring costs (~$20M/yr).
One-Time Capital Costs
Total: $155.3M
Annual Recurring Costs
Total: $20.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.0M/yr
Normal year: steady operations, continuous generation handled by routine teams, no major incidents.
no breaches
routine hourly generation
standard ops tempo
🚨
Minor Incident
$21.5M/yr
Localized containment failure or small-scale release requiring targeted cleanup, overtime, and extra hazardous-waste processing.
canister breach
localized device surge
small release during transport
🚨
Major Breach
$40.0M/yr
Expansion of SCP-9902-A's effective radius or significant facility breach requiring expanded containment, emergency buyout/compensation and large hazardous processing contracts.
zone expansion detected
mass device conversion event
large transport/container failure
🚨
Catastrophic Breach
$120.0M/yr
Widespread failure or rapid expansion producing mass exposures, mass litigation/medical claims, large-scale evacuation and major neutralization/containment expenditures.
rapid multi-km zone expansion
simultaneous multiple-container/transport failures
political exposure forcing public evacuation
Personnel
92 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 45 | [#4] 24/7 armed quarantine enforcement, perimeter patrols, rapid-response; headcount derived from 35–60 FTE range used in wage estimate. |
| Research Scientist | 9 | [#11] Multi-disciplinary research team for chemical/physical/extradimensional analysis and neutralization R&D. |
| Technician / Lab Technician / Containment Technician | 35 | [#14] Dedicated technicians for 24/7 throughput operations handling hourly generation, canister transfers and routine processing. |
| Medical Officer | 3 | [#15] On-site occupational health, screening, emergency response and exposure tracking. |
Confidence Notes
Many costs are driven by highly variable factors (property market for buyouts, unknown rate and volume of hourly generation, long-term medical liabilities, and political/coverage decisions). The containment procedure details and analyst ranges allow a medium-confidence estimate, but major one-off events could materially alter long-run costs.