SCP-9931
Unknown
~
medium confidence
SCP-9931
Expected annual
$8.3M
One-time setup
$8.6M
Annual recurring
$8.2M
Personnel
42
Initial, one-time setup estimated at roughly $8.64M driven by excavation, vault construction, AI compute, and contingency reserves; ongoing annual operations are estimated at ~$6.15M/yr driven by specialist wages, AI operations, MTF deployments, and program overhead.
One-Time Capital Costs
Total: $8.6M
Annual Recurring Costs
Total: $8.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.2M/yr
Normal year: ongoing research, scheduled maintenance, routine transports, and no major incidents.
routine_research
scheduled_maintenance
periodic_transports
🚨
Minor Incident
$6.6M/yr
Localized incident requiring emergency conservation, an additional secure excavation/transport, and elevated PR/legal actions.
small_containment_breach
unexpected_degradation
additional_retrieval
🚨
Research Scale Up
$8.6M/yr
Major validated breakthrough or decision to scale research: additional AI compute, hires, and expanded external contracts.
major_deciphering_breakthrough
funded_scaleup
expanded_collaboration
🚨
Major Breach
$16.1M/yr
Large containment failure or public exposure requiring emergency neutralization, large-scale relocation, international operations and major cover-up/legal payouts.
containment_failure
public_exposure
international_response
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Specialist | 9 | [#12] Archaeologists, paleontologists, materials scientists, corrosion specialists, conservators and domain researchers. |
| AI Engineer / Data Scientist | 5 | [#10] AI engineers, data scientists, and linguists supporting Bouchard.aic, Champollion.aic, and analysis workflows. |
| Security Officer / MTF Agent | 12 | [#13] Mobile Task Force personnel for field operations, retrievals, and site security. |
| Embedded Field Agent | 3 | [#14] Long-term embedded agents at Locations of Interest for surveillance and retrieval assistance. |
| SOC / Security Analyst | 8 | [#17] Security Operations Center staff for 24/7 monitoring of containment sensors and alerts. |
| Program Manager / Administrative Staff | 3 | [#30] Project managers, administrative staff, and accounting overhead for SCP-9931 program. |
| Engineer / Maintenance | 2 | [#18, #4] Facilities and equipment maintenance engineers (HVAC, containment systems, lab equipment). |
Confidence Notes
Estimates use midpoints of broad ranges in analyst notes and aggregate combined-cost line items; SCP-9931 is anomalous with uncertain future scaling (possible large-cost tail events), so there is moderate uncertainty in both one-time capex and recurring operational needs.