SCP-9939
Unknown
~
medium confidence
SCP-9939
Expected annual
$7.7M
One-time setup
$18.3M
Annual recurring
$7.5M
Personnel
41
Initial capital/setup likely in the low tens of millions driven by underground reinforced vault construction, EMP-hardening and heavy custom transfer/equipment; annual recurring costs are driven by specialized staffing, R&D, insurance and perpetual maintenance/hardening.
One-Time Capital Costs
Total: $18.3M
Annual Recurring Costs
Total: $7.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.5M/yr
Normal operational year with no major incidents; routine maintenance, staffing, R&D, and consumables only.
no breach
routine maintenance
scheduled training and R&D
🚨
Minor Incident
$8.0M/yr
Localized EMP emission or small containment breach requiring temporary repairs, targeted reconstruction, extra overtime and external contractors.
isolated EMP event
minor structural damage
short-duration systems outage
🚨
Major Breach
$11.5M/yr
Significant containment failure with widespread EMP effects, major reconstruction, reserve drawdown, large mobilization of HART, and possible public exposure mitigation.
full EMP disabling critical systems
multi-unit reconstruction
massive mobilization & reserve usage
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#10] Armed security presence guarding entry points (12–18 guards estimated; midpoint used). |
| Security / Surveillance Operator | 9 | [#9, #8] 24/7 monitoring room operators (3 per shift plus backups) per analyst note. |
| Research Scientist | 4 | [#17, #18] Level-4 researchers and specialist scientists (geology/geomagnetics/biomechanics) (3–6 suggested; midpoint used). |
| Rapid Response Team / HART Members | 6 | [#12, #13] Dedicated breach containment team with vehicle crew and technicians; staffing consistent with recurring team costs. |
| Medical Officer | 2 | [#19] On-site medics and on-call medical arrangements per year. |
| Engineer / Maintenance | 3 | [#13, #14, #27] Engineers and maintenance staff for heavy machinery, HVAC, decon systems and non-magnetic utilities upkeep. |
| Administrative Staff | 2 | [#24, #30] Administrative and oversight staff handling permits, legal coordination, cover story logistics and site overhead. |
Confidence Notes
Estimates are midpoints of wide ranges provided in analyst notes; many costs (site-dependent construction, reserve sizing, frequency of EMP events) are uncertain but described in reasonable detail, yielding medium confidence.