SCP-995
Euclid
~
medium confidence
SCP-995
Expected annual
$714K
One-time setup
$1.0M
Annual recurring
$694K
Personnel
5
Estimated one-time capital costs are approximately $1.01M driven by containment room construction, terraria, sterilization and transport equipment and a low-probability remediation reserve; recurring annual costs are approximately $694k driven primarily by staff wages, ongoing research/monitoring, emergency contingency and waste/containment consumables.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $694K/yr
Cost Scenarios
📊
Baseline
(baseline)
$694K/yr
Normal year with routine operations, scheduled research and no major containment incidents.
routine_cleaning_and_feeding
scheduled_research
no_breach_or_external_exposure
🚨
Minor Incident
$734K/yr
Small containment event requiring localized depopulation, extra incineration and limited overtime/contractor cleanup.
localized_population_surge
minor_containment_breach
🚨
Major Depopulation
$944K/yr
Large-scale depopulation of one or more colonies with significant disposal, replacement of terraria and extended remediation.
mass_population_overrun
extended_depopulation_and_replacement
🚨
Public Exposure
$994K/yr
External exposure requiring amnestic administration, legal/insurance actions and larger-scale remediation/cover operations.
unauthorized_entry
public_exposure
media_or_third-party_involvement
🚨
Catastrophic Remediation
$1.7M/yr
Worst-case scenario: uncontrolled migration/infestation requiring building decommissioning, demolition and multi-year remediation.
widespread_infestation
failure_of_containment_and_remediation
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Level-2 Technician | 2 | Daily feeding, cleaning, monitoring and specimen transfers. [#7] |
| Level-3 Researcher (allocated) | 1 | Part-time researcher overseeing protocols, approvals and research projects. [#7] |
| Security Officer / Guard | 2 | Access control and on-site security for containment room. [#7] |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing reasonable mid-point estimates; uncertainty remains in event probabilities, research program scale and choice between on-site incinerator vs. per-incident contracting, so confidence is medium.