SCP-9987
Euclid
?
low confidence
SCP-9987
Expected annual
$221K
One-time setup
$603K
Annual recurring
$115K
Personnel
4
One-time setup and potential Earth-transfer facility construction dominate costs (~$0.6M one-time), while steady-state shipboard operation and personnel diversion are the main recurring drivers (~$115k/yr).
One-Time Capital Costs
Total: $603K
Annual Recurring Costs
Total: $115K/yr
Cost Scenarios
📊
Baseline
(baseline)
$115K/yr
Normal uneventful shipboard containment year with routine monitoring, maintenance, medical care and contracted coverage.
no_incident
routine_operations
shipboard_containment
🚨
Minor Incident
$150K/yr
Minor containment incident or behavioral escalation requiring emergency response, extra medical care, sample transfer and PR/legal mitigation.
containment_breach
behavioral_escalation
medical_event
🚨
Transfer And Earth Containment
$975K/yr
Ship returns and SCP-9987 is transferred to an Earth facility; includes secure transport, Earth-cell construction and first-year staffing/setup costs.
scheduled_return
facility_transfer
permanent_containment_setup
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#7] Captain (currently responsible; cost impacts via diversion/hazard pay rather than new hire wages). |
| Research Scientist | 1 | [#7] Senior Researcher (currently responsible; included in personnel diversion calculations). |
| Contracted Crewmember / Relief | 2 | [#7] Contracted relievers or temporary hires to cover mission duties (represented in staff_wages recurring). |
Confidence Notes
Estimates are based on broad ranges in the analyst notes and significant operational uncertainty (shipboard conditions, timing of return, and eventual containment choices), so confidence is low.