SCP-9989
Euclid
~
medium confidence
SCP-9989
Expected annual
$7.1M
One-time setup
$56.6M
Annual recurring
$6.7M
Personnel
31
One-time capital costs are large (~$56.6M) driven primarily by potential vessel acquisition, deep-ROV purchases/upgrades and cable/installation; recurring operations run roughly $6.67M/year driven by vessel crewing/operations, biannual cruises and monitoring/IT/analysis staff.
One-Time Capital Costs
Total: $56.6M
Annual Recurring Costs
Total: $6.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.7M/yr
Normal year with scheduled monitoring, two maintenance cruises, routine maintenance and staff operations; no major incidents.
scheduled_monitoring
routine_maintenance
no_major_incidents
🚨
Minor Incident
$7.9M/yr
Loss/damage of YG-0 or major subcomponent failure requiring emergency salvage, temporary replacement hardware and contractor surge.
YG-0_loss
equipment_damage
urgent_salvage
🚨
Major Recovery Operation
$16.7M/yr
Serious incident (e.g., DSV loss, crew fatalities, or decision to deploy heavy ROVs/tethering and begin neutralization R&D) requiring large one-off expenditures.
crew_casualty
deep_salvage_operation
neutralization_program_start
🚨
Public Exposure Response
$7.4M/yr
Civilian discovery or media exposure requiring rapid PR/legal takedown, misinformation campaigns, and incident response.
media_exposure
civilian_discovery
legal_challenges
Personnel
31 total
| Role | Count | Notes |
|---|---|---|
| Vessel Crew / Deckhands | 16 | Dedicated crew for Merina operations and mission support (item #2). |
| Research Scientist | 6 | Lead researcher, research assistants, marine biologists, linguist, data scientists (item #11). |
| Engineer / Maintenance | 4 | AI/robotics, electronics, ROV maintenance and on-call engineers (item #12). |
| IT / AI Operations | 2 | Sysadmin and ML/AI ops for Kira.aic and Site-110 servers (items #8, #9). |
| Administrative Staff | 2 | Project management, permits and logistics administration (items #21, #28). |
| Medical Officer | 1 | Medical support for vessel/DSV operations and emergency response. |
Confidence Notes
Estimates are built from analyst ranges in the notes and typical maritime/IT cost structures; many items (vessel purchase, neutralization, deep-ROV needs) have wide ranges and scenario-dependent costs, reducing confidence to medium.