SCP-9990 Unknown ? low confidence
SCP-9990
Expected annual
$16.1M
One-time setup
$117.8M
Annual recurring
$14.7M
Personnel
76
Estimated one-time setup costs for a full Appalachian program are roughly $118M, driven mainly by contingency reserves, core drilling, vault construction, facility buildouts, and field fleet; ongoing annual operations run ~ $14.7M driven by personnel, security, vaulted-storage upkeep, and research/monitoring.
🏗️ One-Time Capital Costs Total: $117.8M
Contingency Reserve $50.0M
[#21] Contingency reserve for unexpected large-scale containment/mobilization (budgeted at mid-range of recommended reserve).
Facilities $18.0M
[#1, #8] Sealed/sterile central laboratory upgrades (Site-898) and construction/retrofit of 3–6 forward operating bases; includes structural work, cleanrooms, negative-pressure transfer airlocks, and base construction.
Core Drilling Campaign $12.0M
[#4] Core-drilling program and geological sampling campaign (continent-scale / extended campaign mid-range budget).
Monitoring Network $8.0M
[#9] Long-term monitoring network installation (100–500 stations, mid-range scale).
Field Fleet Capital $7.5M
[#5] Capital purchase of field fleet (1 helicopter purchase + ground vehicles) to enable rapid access and heavy-lift; aviation purchase chosen over leasing in this estimate.
Equipment $6.0M
[#2] Specialized analytical instrumentation for Akiva-resistant detection (mass specs, EM, isotope-ratio units, cryostorage) and any custom shielding required for instruments.
Vaulted Storage Cells $4.0M
[#17] Initial vaulted storage and secure containment capacity (provisioning multiple vaults/cells at mid-range per-cell cost).
Initial Research And Lab Setup $3.0M
[#10] Initial R&D and laboratory setup to mitigate Akiva interference and prototype custom sensors/signal processing methods.
Decommissioning Stewardship $2.0M
[#24] Decommissioning and long-term stewardship cost allowance (site remediation, long-term storage/archive).
Field Labs $1.8M
[#3] Mobile sealed field-labs and sample-prep trailers (4–8 trailers at mid-range cost).
Legal And Land Acquisition $1.5M
[#13] Initial legal/setup and land-access costs for leases, easements, and property acquisition across multiple jurisdictions.
Emergency Response Cache $1.2M
[#16] Setup of emergency response caches, mobile decon units, field triage, containment barriers and emergency power generators.
Legal Contingency Reserve $1.0M
[#25] Initial one-time legal reserve for contingency legal defense and unusual permit costs.
Data Infrastructure $600K
[#12] Initial data storage, compute, GIS/ML hardware and secure classified-network segmentation.
Environmental Mitigation Initial $500K
[#15] Initial environmental mitigation and compliance (studies/remediation/mitigation construction for major sites).
Sample Tooling Stock $350K
[#11] Setup tooling and stock for sample containment, transport and sterilization consumables (containers, cryo-shippers, autoclave stock).
Communications Infrastructure $350K
[#23] Secure field communications, encrypted satcom/radio baseline infrastructure.
🔄 Annual Recurring Costs Total: $14.7M/yr
Staff Wages $4.5M/yr
[#6] Salaries/benefits for core scientific staff (geologists, geophysicists, Akiva specialists, lab techs, data scientists) and field allowances/hazard pay.
Security And Mtf $3.0M/yr
[#7] Salaries, training, equipment, and standby costs for armed security and dedicated Mobile Task Force units.
Vaulted Storage Maintenance $1.6M/yr
[#17] Security, climate control, and maintenance for vaulted storage/cells (scaled for multiple containment cells).
Cover Story And Legal $1.2M/yr
[#13, #14, #25] Annual property/lease costs, cover programs, PR suppression and ongoing legal counsel; includes media buys and local liaisons.
Facilities Maintenance $600K/yr
[#1, #8] Ongoing maintenance of sterile lab systems, HVAC/filtration redundancy, and forward base upkeep.
Research And Monitoring $500K/yr
[#10, #12] Ongoing R&D to mitigate Akiva interference, sensor development, and research project funding; includes some data/modeling upkeep.
Contracted Third Party $500K/yr
[#22] Fees for contracted analyses, academic collaborations, consultants and trusted external labs.
Monitoring Maintenance $400K/yr
[#9] Annual maintenance, calibration, and power upkeep for the deployed monitoring network.
Training Medical $350K/yr
[#18] Medical surveillance, psychological screening, specialized testing and ongoing personnel monitoring.
Logistics And Transport $300K/yr
[#5, #19] Recurring transport logistics (fuel/maintenance for field fleet, couriers for classified sample transfer, resupply runs to bases).
Equipment Maintenance $300K/yr
[#2] Maintenance, calibration and service contracts for high-end instrumentation (mass specs, EMs, isotope units).
Permits Insurance $300K/yr
[#25] Annual permits, insurance premiums and miscellaneous recurring legal/permit costs.
Security Deployment Costs $200K/yr
[#7] Per-deployment emergency costs averaged annually for MTF activations, special logistics and rapid response.
Environmental Mitigation Annual $200K/yr
[#15] Ongoing environmental compliance, monitoring, and remediation costs.
Supplies And Consumables $150K/yr
[#11] Recurring consumables for sample containment, sterilants, cryo-shippers and autoclave supplies.
Data Maintenance $150K/yr
[#12] Cloud/backup costs, compute upkeep and cybersecurity for classified networks.
Waste Management $150K/yr
[#20] Disposal of contaminated PPE, hazardous drilling cuttings and clandestine hazardous waste handling.
Mobile Field Labs Maintenance $125K/yr
[#3] Annual maintenance and upgrades for mobile sealed field-labs and trailers.
Emergency Training Replenishment $100K/yr
[#16] Recurring training, equipment replenishment, and exercises for emergency response caches and decon units.
Communications Maintenance $100K/yr
[#23] Upkeep, lease fees and airtime for secure radios, satellite links and clandestine comms.
Cost Scenarios
📊 Baseline (baseline) $14.7M/yr
86.0% probability / year
Normal operational year with routine field campaigns and no major discoveries or large-scale incidents.
scheduled_field_campaigns routine_maintenance
🚨 Minor Incident $15.5M/yr
10.0% probability / year +$800K vs baseline
Localized field incident requiring emergency MTF response, minor equipment loss/repair, and extra legal/PR action.
localized_breach equipment_damage
🚨 Deific Remnant Discovery $24.7M/yr
3.0% probability / year +$10.0M vs baseline
Discovery of a deific remnant requiring immediate expanded vaulted storage, elevated security posture and accelerated R&D/containment.
confirmed_deific_remnant expanded_containment_requirements
🚨 Major Breach $114.7M/yr
1.0% probability / year +$100.0M vs baseline
Catastrophic containment failure or active deific remnant necessitating mass mobilization, population control, or major engineering works.
large_scale_activation mass_mobilization
👥 Personnel 76 total
Role Count Notes
Research Scientist 25 Included in core scientific staffing for geology, geophysics and Akiva specialists. [#6]
Laboratory Technician 10 Lab techs for sterile sample processing and instrument operation. [#6, #2]
Data Scientist / Analyst 3 Data/modeling, GIS and ML support for large geophysical datasets. [#12, #10]
Administrative Staff / Site Director 2 Site administration, program management and legal/land liaison. [#13]
Security Officer / MTF Agent 36 Armed security and dedicated Mobile Task Force personnel for field protection and rapid recovery. [#7]
📋 Confidence Notes
Estimates derive from wide ranges in analyst notes and the inherently uncertain scope of SCP-9990 (unknown extent, discovery-dependent costs). Many line items are scenario-dependent (number of finds, campaign scale), reducing confidence.
← SCP-9989 ↑ All SCPs SCP-9991 →