Expected annual
$3.5M
One-time setup
$6.3M
Annual recurring
$3.4M
Personnel
29
One-time establishment costs are approximately $6.29M driven by land acquisition, site stabilization/structural work, construction of a provisional command post and equipment procurement; ongoing annual costs are approximately $3.40M driven mainly by security and scientific staff, site operations, and cover/administrative expenses.
One-Time Capital Costs
Total: $6.3M
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Normal year with routine operations, maintenance, research, and cover operation with no major incidents.
routine_operations
scheduled_maintenance
planned_research_activities
🚨
Minor Incident
$3.7M/yr
Localized cave-in, small containment breach or equipment failure requiring emergency repairs, short-term contractor mobilization, and extra legal/PR activity.
localized_cave-in
sensor_alerts
minor_equipment_failure
🚨
Major Breach
$5.9M/yr
Significant structural collapse or containment failure exposing inaccessible wings or causing public exposure and major remediation, legal, and PR response.
major_cave-in
public_exposure
loss_of_containment
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#6] 18 uniformed armed posts (4 vents + 2 main entry × 3 shifts) for 24/7 coverage; payroll and benefits budgeted in staff_wages. |
| Research Staff (aggregate: PI/postdocs/technicians) | 8 | [#18] Research Team Caviidae (6–10 personnel) aggregated to 8 full-time equivalents; salaries included in staff_wages. |
| Site Director / Executive Staff | 1 | [#30] On-site leadership / site management included in administrative staffing. |
| Administrative Staff | 1 | [#30] Administrative accounting/compliance support for Site-127 and the Atlas Burning front; included in staff_wages. |
| Engineer / Maintenance | 1 | [#14, #16] On-call engineer/maintenance specialist for structural stabilization oversight, equipment maintenance; costs included in staff_wages and facilities_maintenance. |
Confidence Notes
Analyst notes provide detailed line items and plausible ranges allowing mid-range estimates, but substantial uncertainty remains due to unknown extent of inaccessible wings, variable number of vents/posts, and potential scale of stabilization or remediation that could dramatically increase costs.