SCP-1050
Safe
~
medium confidence
SCP-1050
Expected annual
$14.7M
One-time setup
$6.9M
Annual recurring
$4.6M
Personnel
24
One-time containment and infrastructure upgrades are estimated at approximately $6.9M, with recurring annual costs around $4.64M; largest recurring drivers are staff wages, global telemetry partnerships, security and rapid-response logistics, while one-time drivers include specialized chamber construction, heavy-lift placement and contingency/reserve funds.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal operational year with planned staffing, telemetry access, scheduled training, maintenance and routine rapid-response ops accounted for.
routine_operations
scheduled_maintenance
planned_MTF_ops
🚨
Minor Incident
$5.1M/yr
Unplanned additional field recoveries or localized containment work requiring extra rapid-response ops, legal/PR activity and logistics beyond baseline assumptions.
unexpected_detection
additional_seizure_ops
localized_legal_pushback
🚨
Major Breach
$7.1M/yr
Containment hardware failure or high-power RF event causing shielding damage, requiring emergency repairs, replacement of absorbers/load banks and significant remediation/PR.
shielding_failure
high_power_emission
facility_damage
🚨
Catastrophic Event
$10.0B/yr
Existential-level detection or event requiring planetary-scale mitigation, international coordination, and multi-billion-dollar response beyond normal containment.
existential_threat
large_scale_emission
international_mobilization
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] 24/7 security coverage across multiple shifts; cost estimate derived from ~12 officers at ~$55k fully loaded each. |
| Site Security Supervisor | 2 | [#8] Supervisory staff for security shifts and rovers. |
| Research Scientist | 4 | [#9, #15] Stone/conservation specialists and research staff for ongoing materials/forensic programs. |
| RF Engineer | 2 | [#9, #5] RF engineering staff to manage shielding, absorbers and spectrum monitoring. |
| Site Technician / Watch Technician | 2 | [#9, #16] 24/7 watch technicians and site techs to monitor sensors and run immediate tests. |
| Site Director / Executive Staff | 1 | [#26] Overall site management and executive oversight included in overhead allocation. |
| Administrative Staff | 1 | [#18, #26] Administrative/liaison support for legal, cover and logistics coordination. |
Confidence Notes
Analyst notes provide detailed line-item estimates and ranges, enabling a mid-confidence budget. Significant uncertainty remains due to redacted/unknown emission power, possible material differences in the obelisk, and low-probability high-impact scenarios that could change costs by orders of magnitude.