SCP-1058
Safe
✓
high confidence
SCP-1058
Expected annual
$1.4M
One-time setup
$543K
Annual recurring
$1.4M
Personnel
13
Initial containment/refit estimated at roughly $543,000 one-time for cell modifications, monitoring, and equipment; ongoing annual costs are approximately $1,382,800 driven primarily by 24/7 security, research staffing, and recurring sand handling/disposal and analytical services.
One-Time Capital Costs
Total: $543K
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal operational year with scheduled sand replacements, routine monitoring, and no major incidents.
scheduled sand replacement
routine monitoring
no system failures
🚨
Minor Incident
$1.4M/yr
Localized equipment failure or minor containment event requiring overtime, immediate repairs, and short-term cleanup.
single-light or UPS failure
HEPA/ventilation fault
small containment-side cleanup
🚨
Major Breach
$1.6M/yr
Significant containment breach, contamination spread, serious injury/fatality, or legal exposure requiring extensive cleanup, investigation and potential litigation.
large-scale sand alteration spread
fatality or serious medical incident
substantive legal/exposure event
🚨
Research Breakthrough Requiring Scale Up
$1.6M/yr
Successful experimental results prompt a funded scale-up, additional contracting, or purchase of major analytical instruments.
promising mechanism result
need for purchased instrumentation
external contracting under cover
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Six on-site guards providing continuous adjacent coverage (multiple shifts). |
| Security Supervisor | 1 | [#7] Single supervisor/lead for scheduling, oversight and escalation. |
| Containment Technician | 2 | [#8] Two full-time technicians for sand replacement, sensor maintenance, and entry operations. |
| Research Scientist | 2 | [#9] Two full-time researchers conducting mechanism studies and experiments. |
| Research / Lab Technician | 1 | [#9, #12] One lab tech supporting sample prep, imaging and routine analyses. |
| Medical Officer | 1 | [#10] Allocated medical staff for periodic physicals, emergency response and psychiatric evaluations. |
Confidence Notes
Analyst provided detailed line-item ranges for infrastructure, staffing, consumables and recurring services which yields a well-constrained budget; scenario probabilities and contingency sizing are judgment calls, but core recurring costs (staffing, sand logistics, analytical services) are well-supported. [#25]