SCP-1426
Safe
~
medium confidence
SCP-1426
Expected annual
$790K
One-time setup
$882K
Annual recurring
$767K
Personnel
3.7
Initial one-time setup is moderate-to-high (~$0.9M) driven mainly by potential biocontainment upgrades and research lab capital; routine annual operations are ~ $0.77M/year dominated by staff wages and recurring analytical access/overhead. Rare major incidents (theft/loss/containment failure) can add large one-off costs (hundreds of thousands).
One-Time Capital Costs
Total: $882K
Annual Recurring Costs
Total: $767K/yr
Cost Scenarios
📊
Baseline
(baseline)
$767K/yr
Normal, uneventful year with routine testing, maintenance, instrumentation access and no major incidents.
routine_testing
no_loss_or_public_exposure
🚨
Minor Incident
$817K/yr
Localized contamination event, single-sample loss/theft or small public exposure requiring modest recovery, legal and decontamination actions.
single_sample_contamination
minor_public_exposure
small_recovery_operation
🚨
Major Recovery Operation
$1.6M/yr
Theft or loss of an anomalous bit or containment breach that requires a large field recovery, public operations, legal fallout and possibly an immediate biocontainment upgrade.
theft_or_loss_of_bit
major_public_exposure
containment_failure
Personnel
3.7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (senior) | 1 | Lead scientist handling approvals, design and oversight; salary allocation included in staff_wages. |
| Postdoc / Research Associate | 1 | Dedicated researcher performing tests and analysis; salary included in staff_wages. |
| Technician | 1 | Lab technician for preparation, sterilization and sample handling; salary included in staff_wages. |
| Administrative Staff | 0.5 | Part-time admin time for record-keeping, scheduling and sign-off coordination; portion of salary included in staff_wages. |
| Medical Officer / On-call Medic | 0.2 | On-call medical allocation for emergency readiness (partial FTE equivalent); included in staff_wages. |
Confidence Notes
Many routine costs are well-estimated (staffing, access fees, consumables) giving moderate confidence, but large uncertainty remains around contingent items (BSL-3 upgrades, major recoveries, full instrumentation purchases) which could dramatically increase one-time and annual costs.