SCP-1435
Euclid
~
medium confidence
SCP-1435
Expected annual
$3.7M
One-time setup
$24.1M
Annual recurring
$3.6M
Personnel
22
Estimated upfront capital of approximately $24.1M driven primarily by underground corridor construction, contingency reserves and specialized non-visual equipment; recurring annual costs are approximately $3.586M driven by staffing, facilities maintenance, R&D, and legal/cyber monitoring.
One-Time Capital Costs
Total: $24.1M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal operational year with routine maintenance, staffing, research and ongoing cyber/legal monitoring; no major growth or relocation events.
no_incidents
routine_operations
🚨
Minor Incident
$3.7M/yr
Small, localized growth event requiring cleanup, extra mortuary/forensic work, overtime and limited takedown activity.
small_growth_event
localized_cleanup
minor_data_takedown
🚨
Major Breach
$8.6M/yr
Major uncontrolled growth or exposure requiring mass cleanup, emergency construction, significant relocation or large PR/PR takedown operations.
major_growth_event
mass_removal
emergency_relocation
🚨
Relocation Move
$5.1M/yr
Planned or emergency site relocation/decommissioning requiring specialized transport, permits, road/rail closures and controlled viewing protocols.
forced_relocation
site_decommission
regulatory_action
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#8] 24/7 armed security staffing across shifts (three shifts + relief). |
| Security Supervisor | 1 | [#8] On-site supervisor/shift lead for security contingent. |
| Research Scientist | 4 | [#9, #14, #15] Containment scientists, biologists and materials scientists handling protocols and blind-analysis research. |
| Engineer / Maintenance | 2 | [#5, #16, #23] Robotics, HVAC, generator and facility maintenance staff. |
| Administrative Staff | 1 | [#19, #21] Admin/legal liaison supporting cover-story, compliance and access control. |
Confidence Notes
Analyst notes provide many line-item estimates and ranges enabling a reasoned budget, but uncertainty remains due to the object's growth unpredictability, potential for large-scale events and variability in PR/takedown/relocation frequency.