SCP-1469
Euclid
~
medium confidence
SCP-1469
Expected annual
$4.0M
One-time setup
$2.5M
Annual recurring
$3.9M
Personnel
33
One-time setup and capital (site purchase, fencing, comms hard-line, vehicles and contingency seed) are estimated at $2,495,000. Annual recurring costs are driven by personnel payroll, ongoing research/monitoring, maintenance, and contingency/top-up funds totaling $3,785,000/year.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Routine year with no major incidents: steady operations, scheduled maintenance, research and regular expeditions.
routine_operations
scheduled_research_and_maintenance
🚨
Minor Incident
$4.3M/yr
Localized incident requiring emergency response, demolition/repair of one or more houses, increased amnestic use and legal/PR costs.
localized_demolition
equipment_damage
amnestics_deployment
🚨
Exploration Scaleup
$8.8M/yr
Decision or requirement to attempt deep exploration/temporary occupation inside SCP-1469-2, triggering large capital investment and elevated recurring costs.
deep_exploration
permanent_habitat_setup
major_infrastructure_investment
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#3] 24/7 perimeter security staffing (3 shifts, 2–4 guards per shift). |
| MTF / Response Team Members | 8 | [#11] Dedicated rapid-response team for expeditions and containment/retrieval operations. |
| Research Scientist | 4 | [#11, #15] Level 2–4 researchers performing laboratory analysis, ecological and materials research. |
| Technician | 4 | [#9, #11] Field and lab technicians supporting drones, sensors, LIDAR, and sample processing. |
| Site Director / Executive Staff | 1 | [#11] Designated Site Director with necessary oversight and approval authority. |
| Medical Officer | 2 | [#12] On-site medic(s) and medical support for expeditions and detentions. |
| Engineer / Maintenance | 2 | [#8, #4] Support for generators, vehicles, hard-line and facility maintenance. |
| Administrative Staff | 2 | [#29] Program manager/procurement and accounting/audit support. |
Confidence Notes
Estimates are based on analyst-provided ranges and typical Foundation operational models; many line items have wide ranges and conditional/feasibility-driven costs (deep exploration, buyouts, catastrophic events), reducing precision.