SCP-1500
Safe
✓
high confidence
SCP-1500
Expected annual
$551K
One-time setup
$416K
Annual recurring
$541K
Personnel
7.5
One-time setup costs are approximately $415,500 driven by custom containment construction, robotics, sensors and HVAC; recurring annual costs are approximately $541,225 dominated by dedicated security and specialist staffing plus site overhead and research/monitoring.
One-Time Capital Costs
Total: $416K
Annual Recurring Costs
Total: $541K/yr
Cost Scenarios
📊
Baseline
(baseline)
$541K/yr
Normal uneventful year with no major incidents; routine operations, monitoring, maintenance and staffing as budgeted.
normal monitoring
scheduled maintenance
routine consumable replenishment
🚨
Minor Incident
$566K/yr
Localized root penetration or mechanical failure requiring emergency repairs and contractor response.
small root breach
mechanical failure of irrigation/robotics
🚨
Major Breach
$791K/yr
Significant containment breach or infrastructure damage from aggressive root growth requiring major repairs, containment reinforcement, and external specialists.
large-scale root-induced structural damage
failure of primary containment barriers
🚨
Political Exposure
$1.0M/yr
High-impact exposure event involving prominent affected individuals requiring extensive amnestic efforts, legal damage control, media management and potential large-scale remediation.
public/political exposure
widespread memetic influence discovered
Personnel
7.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#11] 24/7 restricted-area enforcement, ~5 FTE guards (three shifts + overlap/leave). |
| Research Scientist | 1 | [#12, #21] Fractional plant physiologist (0.5–1.0 FTE budgeted; represented as 1 FTE here to reflect available oversight and minimal permitted research). |
| Medical Officer | 0.5 | [#12] Fractional clinician for non-invasive health oversight (0.5 FTE equivalent). |
| Engineer / Maintenance | 1 | [#12, #13] Automation/controls engineer (fractional) responsible for robotics, irrigation and remote systems; preventative maintenance contract supplements staff. |
Confidence Notes
Analyst notes provide line-item estimates for nearly all major components (construction, equipment, staffing, maintenance), enabling a high-confidence aggregation; residual uncertainty remains in long-term behavior and contingency sizing.