SCP-1615
Safe
~
medium confidence
SCP-1615
Expected annual
$1.9M
One-time setup
$5.7M
Annual recurring
$1.8M
Personnel
18
Initial capital (construction, equipment, research setup, and a contingency reserve) dominates one-time costs; ongoing expenses are driven by staff wages, security, surveillance/testing, and contingency allocations for potential outbreaks.
One-Time Capital Costs
Total: $5.7M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year with routine surveillance, maintenance, and no containment incidents beyond expected testing/quarantine.
routine_surveillance
planned_research
no_public_exposure
🚨
Minor Incident
$1.9M/yr
Localized contamination event requiring rapid response, field destruction of contaminated food, limited recall and targeted public messaging.
localized_contamination
field_destruction
small_local_recall
🚨
Major Recall
$3.8M/yr
Regional contamination discovered in a distributed product requiring large-scale recall, extensive testing, compensations, and widescale quarantine of exposed individuals.
regional_distribution
large_recall
legal_compensation
🚨
Catastrophic Outbreak
$16.8M/yr
Widespread contamination reaching national distribution, requiring mass quarantine, major recalls, long-term care costs, and large settlements.
national_distribution
mass_quarantine
major_legal_liability
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Mycologist | 3 | PI + two researchers to run assays, sequencing, and experimental work (part of research payroll). |
| Laboratory Technician | 2 | Technicians for sample prep, routine testing, and equipment operation. |
| Security Officer / MTF Agent | 10 | Multi-shift security staff covering 24/7 access control and containment monitoring. |
| Medical Officer / Nurse | 1 | Medical monitoring, quarantine oversight, and clinical follow-up for exposed subjects. |
| Engineer / Maintenance | 1 | Equipment, HVAC, and facility maintenance support (autoclave, freezers, HVAC). |
| Administrative Staff | 1 | LIMS/recordkeeping, scheduling, and administrative coordination. |
Confidence Notes
Costs are estimated from explicit analyst ranges in notes; equipment and staffing are reasonably well-defined but outbreak/recall impacts, contingency sizing, and longer-term research costs are highly variable, so confidence is medium.