SCP-1616
Keter
~
medium confidence
SCP-1616
Expected annual
$1.6M
One-time setup
$1.9M
Annual recurring
$1.5M
Personnel
12
Initial capital costs are approximately $1.91M driven by reinforced structural containment, subterranean mass-capture vault, lab buildout, and a contingency reserve; recurring annual costs are roughly $1.51M driven primarily by staff wages (monitoring, security, and research) and ongoing bio‑containment operations.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal year with no major incidents; routine operations, scheduled maintenance, and planned research activity.
no_breach
routine_research
scheduled_maintenance
🚨
Minor Incident
$1.6M/yr
Localized containment breach or medium-scale mass generation requiring extra disposal, overtime, emergency repairs, and legal/medical incident response.
small_breach
extra_disposal
overtime_repairs
🚨
Major Breach
$2.3M/yr
Large mass event or containment failure requiring contingency fund activation, mass disposal, temporary relocation, heavy contracting, and significant investigations.
large_mass_event
site_level_response
external_contractors
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Monitor Operator | 4 | [#6, #7] 24/7 live monitoring rotation covering the live-only feed and immediate alarm response (4 FTE). |
| Security Officer / MTF Agent | 3 | [#8] On-site rapid-response security team (3 FTE to cover shifts; trained in containment protocols). |
| Engineer / Maintenance | 1 | [#9] Containment engineer/maintenance technician (preventive maintenance and emergency repairs). |
| Research Scientist | 3 | [#16, #17] Research scientists performing pathology and neural-link studies (3 senior scientists as budgeted). |
| Veterinarian / Animal Technician | 1 | [#17, #26] Dedicated veterinarian/animal tech on staff (plus an on-call veterinarian retainer accounted in recurring costs). |
Confidence Notes
Line items and recurring staff estimates are well-specified, but several ranges (vault cost, lab equipment scope, contingency sizing, and per-incident disposal) introduce material uncertainty; probability estimates for incidents are heuristic.