SCP-1627
Euclid
~
medium confidence
SCP-1627
Expected annual
$13.7M
One-time setup
$33.1M
Annual recurring
$13.3M
Personnel
75
Initial capital costs are dominated by site works, remediation/buyout and built containment (~$33M one-time). Annual operations are driven by security, research staff, and quarantine/logistics (~$13.3M/year).
One-Time Capital Costs
Total: $33.1M
Annual Recurring Costs
Total: $13.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.3M/yr
Normal year with steady containment, routine monitoring, and no major incidents.
no breach
limited research progress
routine quarantine operations
🚨
Minor Incident
$15.8M/yr
Localized outbreak or spike in anomalous activity requiring short-term surge response, intensified testing and limited additional quarantine enforcement.
localized spread outside boundary
small cluster of SCP-1627-B sightings
short-term escalation of quarantine
🚨
Major Breach
$33.3M/yr
Large-scale outbreak or containment failure requiring prolonged quarantine, large remediation effort and potential town buyout/relocation and demolition.
widespread SCP-1627-B spread
failure of perimeter containment
necessity of town buyout/large remediation
Personnel
75 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 50 | [#1] Fifty armed personnel required for 24/7 perimeter security (rotations included). |
| Shift Supervisor / Security Supervisor | 5 | [#2] Supervisory staff to manage shifts and coordinate security operations. |
| Medic / Medical Officer | 2 | [#2] On-site medics to support personnel and handle exposures/trauma. |
| Communications / Comms Staff | 3 | [#2] Radio/comms operators and monitoring staff for perimeter and field teams. |
| Administrative Staff | 5 | [#2] Payroll, recruiting, and administrative support for site operations. |
| Research Scientist | 6 | [#14] Mycologists, immunologists and pathologists (midpoint of estimated research team). |
| Research Technician | 4 | [#14] Lab technicians to support experiments, sequencing, and sample prep. |
Confidence Notes
Line-item ranges and site-specific variables (terrain, town population/property values, duration of quarantine) create uncertainty. Core operational categories (security, labs, monitoring) are well-defined, but major capital choices (buyout vs. in-place remediation) drive wide variance.