SCP-1628
Euclid
~
medium confidence
SCP-1628
Expected annual
$2.8M
One-time setup
$6.3M
Annual recurring
$2.8M
Personnel
23
Initial one-time capital of approximately $6.3M is required primarily for site purchase/retrofit, contingency reserves, demolition capability, and lab/setup; ongoing annual operations are roughly $2.8M driven by staff wages, security, research operations, and contingency top-ups.
One-Time Capital Costs
Total: $6.3M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal, uneventful year with routine operations and no major incidents.
routine_operations
scheduled_expeditions
🚨
Minor Incident
$3.0M/yr
Small containment incident or exposure requiring overtime, small legal/amnestic response, and limited remediation.
small_breach
unexpected_entity_interaction
localized_equipment_failure
🚨
Major Breach
$3.8M/yr
Significant breach requiring large response, extended remediation, external contractors, and major legal/compensation costs.
security_breach
large_entity_escape
major_equipment_failure
🚨
Explosive Collapse Use
$4.3M/yr
Execution of controlled demolition to collapse entrance (containment-by-destruction) triggering large remediation, environmental cleanup and site closure costs.
containment_detonation
site_decommissioning
mass_remediation
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#11] 9–12 guards plus supervisors; modeled as 12 guards + 2 supervisors for 24/7 coverage and rapid response (personnel costs reflected in staff_wages). |
| Research Scientist | 5 | [#12, #18] Core research staff (3–6); modeled as 5 researchers to support expeditions and analysis (costs included in scientific staff line). |
| Field Technician | 2 | [#12, #13] Field techs to support underground expeditions and equipment maintenance (included in scientific staffing costs). |
| Administrative Staff | 2 | [#2, #12, #26] Small admin support for front company, recordkeeping, HR and liaison functions (costs included in staff_wages and administrative_overhead). |
Confidence Notes
Estimates are mid-range point estimates based on analyst-provided ranges and standard covert-containment assumptions. Many contingency items (explosive use, decommissioning) are highly variable which reduces confidence to medium.