SCP-1648
Safe
~
medium confidence
SCP-1648
Expected annual
$951K
One-time setup
$1.2M
Annual recurring
$926K
Personnel
9
Initial one-time containment and specialized equipment costs are approximately $1.16M, driven by reinforced chamber construction, high-speed imaging, remote manipulators, robotics and contingency funds. Annual recurring costs are about $956k/yr, dominated by security and scientific staff wages plus testing, disposal, and contracted response/cover operations.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $926K/yr
Cost Scenarios
📊
Baseline
(baseline)
$926K/yr
Normal uneventful year with routine testing and full compliance with containment protocols.
no major incidents
routine testing only
standard staffing and contracts
🚨
Minor Incident
$1.0M/yr
Small hazardous construct or localized fire/smoke event requiring disposal, short repairs and overtime.
combustion of a construct
localized contamination
short-term overtime/contractor repairs
🚨
Major Breach
$1.2M/yr
Containment failure or creation causing significant damage, requiring containment upgrades and major equipment replacement.
dangerous construct escapes quarantine
structural damage to chamber
extensive equipment replacement
🚨
Political Exposure
$1.5M/yr
Public incident or procurement exposure requiring aggressive legal/PR response, long-term cover operations and possible settlements.
public incident
procurement trace or whistleblower
media/legal escalation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | 24/7 rotating guards (salaries included in staff_wages) to supervise containment. |
| Security Supervisor / Dispatcher | 1 | Supervisor/dispatcher for rapid response and shift coordination. |
| Research Scientist | 1 | Lead researcher overseeing experiments and data analysis. |
| Animal Care Specialist / Xenobiologist | 1 | Caretaker experienced with exotic/necrotic tissues; manages feeding and health. |
| Technician / Lab Technician | 2 | Technical staff for cameras, sensors, robotics and daily operations. |
Confidence Notes
Detailed line-item estimates provided by analyst notes enable a reasonable budgetary picture, but uncertainty remains around frequency/severity of hazardous constructs and testing frequency which can drive large cost spikes.