SCP-165
Keter
~
medium confidence
SCP-165
Expected annual
$9.2M
One-time setup
$115.0M
Annual recurring
$8.9M
Personnel
31
Initial capital requirements are very large (primarily facility construction, contingency reserves, and specialized equipment) with recurring operating costs driven by specialized staff, energy, maintenance, and live‑feed logistics. Total initial one‑time capital is on the order of $115M; ongoing annual operations are roughly $8.94M, with risk scenarios that can add millions in a breach year.
One-Time Capital Costs
Total: $115.0M
Annual Recurring Costs
Total: $8.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.9M/yr
Normal operational year with no major incidents; routine research, maintenance, feeding and monitoring.
routine_operations
no_breach
scheduled_maintenance
🚨
Minor Incident
$9.9M/yr
Small containment event requiring limited emergency response, extra disposal and short‑term repairs.
localized_breach
equipment_failure
small_infestation_escape
🚨
Major Breach
$23.9M/yr
Significant containment failure requiring evacuation, mass decontamination, replacement of major infrastructure and legal/PR payouts.
large_scale_escape
public_exposure
facility_loss
Personnel
31 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#10] Dedicated security corps for 24/7 coverage (estimate midpoint of 12–20 FTEs). |
| Research Scientist | 8 | [#11] Entomologists, parasitologists, microbiologists and containment scientists (midpoint of 6–10 FTEs). |
| Engineer / Maintenance | 6 | [#12] HVAC engineers, microwave technicians, electricians and maintenance staff (midpoint of 4–8 FTEs). |
| Veterinary / Animal Technician | 1 | [#8] One FTE veterinarian (plus on‑call technicians covered in recurring costs). |
Confidence Notes
Many line items are given as wide ranges and include large contingency/reserve decisions; core recurring operational costs (staff, energy, basic maintenance, feeding) are reasonably well specified but reserves and breach cost magnitudes are highly uncertain.