SCP-1655
Euclid
~
medium confidence
SCP-1655
Expected annual
$2.1M
One-time setup
$2.1M
Annual recurring
$2.1M
Personnel
5
Upfront one-time setup (containment cell, lab equipment, secure archives, and contingency reserves) is roughly $2.14M; recurring annual operations (staff wages, D-class program, research, MTF readiness, legal/cover operations, consumables, and overhead) are approximately $2.04M/yr, driven primarily by research salaries, D-class program costs, contingency/countermeasure programs, and cover/legal obligations.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal operational year with no major incidents; steady-state containment, research, D-class rotations, and upkeep.
no incidents
routine research and maintenance
🚨
Minor Incident
$2.6M/yr
Single biting event affecting one D-class or staffer requiring acute medical care, psychiatric support, targeted amnestics/cover-up, and localized MTF response.
single bite
localized exposure
one-off amnestic deployment
🚨
Major Breach
$4.0M/yr
Multiple exposures / public-facing incident requiring mass amnestics, large-scale PR/compensation, region-wide containment and a rapid scale-up of countermeasure efforts.
multiple public exposures
mass amnestic campaign
accelerated countermeasure deployment
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#5] One full-time security officer assigned to the chamber (salary+benefits ~ $70k/yr; overtime accounted in staff_wages). |
| Research Scientist / Technician / Veterinarian / Behaviorist | 4 | [#11] Four FTE research/technical staff total (combination of 1–2 senior anomaly researchers, 1–2 postdocs/technicians, veterinarian/behavioral scientist; combined salary estimate ~$450k/yr). |
Confidence Notes
Detailed line-item estimates were provided for most categories, but several high-impact items (per-incident cover costs, contingency reserve sizing, and future countermeasure development) are inherently uncertain; numerical choices used midpoints or conservative assumptions.