SCP-1747
Euclid
~
medium confidence
SCP-1747
Expected annual
$1.4M
One-time setup
$2.3M
Annual recurring
$1.3M
Personnel
11
Up-front capital costs to secure the cemetery, build containment, and establish off-site storage are estimated at roughly $2.35M, driven by land acquisition, construction of Site-876, forensic lab build-out, and vehicle/equipment purchases. Recurring annual costs are estimated at roughly $1.35M/year, driven primarily by 24/7 armed security, surveillance staffing, research/forensic monitoring, and administrative/legal/cover-story expenses.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with nightly manifestations contained, no major incidents or breaches; regular research and maintenance continue.
no breaches
routine operations
scheduled research/maintenance
🚨
Minor Incident
$1.5M/yr
Localized containment incident requiring emergency response, limited forensic recoveries, short-term PR/legal work and temporary repairs.
localized breach or unauthorized approach
anomalous generation of remains requiring extra processing
minor equipment failure
🚨
Major Breach
$2.3M/yr
Significant containment failure or public exposure requiring extensive emergency response, site repairs/reconstruction, large-scale forensic processing, relocation or re-securing of the object, and major legal/PR efforts.
large-scale breach or public exposure
SCP-1747-1 becomes accessible to SCP-1747-2 or civilians
forced excavations and mass remains generation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Six armed guards to provide minimum two-on-site at all times across shifts. |
| Security Supervisor | 1 | [#4] One site security supervisor/lead to manage guard rotations, vetting and operations. |
| Surveillance Operator | 3 | [#5] Two–three operators to monitor live feeds and log nightly manifestations; budgeted as three positions for shift coverage. |
| Administrative Staff | 1 | [#28] One administrative/project manager position for liaison, scheduling and reporting. |
Confidence Notes
Analyst notes provide ranges for nearly all line items, permitting mid-range estimates, but uncertainties remain around land costs, choice between response vehicle purchase vs. contract, frequency/severity of anomalous events, and research intensity; this yields a medium confidence in the numeric estimates.