SCP-1821
Safe
?
low confidence
SCP-1821
Expected annual
$8.7M
One-time setup
$728.3M
Annual recurring
$7.3M
Personnel
12
Initial capital and engineering (custom high-pressure tank, reservoir, DOCC/ROV systems) drive up-front costs into the hundreds of millions; recurring costs are dominated by specialized 24/7 staff, continuous power/chiller operation, and insurance/maintenance (~$7.3M/year).
One-Time Capital Costs
Total: $728.3M
Annual Recurring Costs
Total: $7.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.3M/yr
Normal, uneventful year with routine operations and maintenance only.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$8.8M/yr
Localized equipment failure or small pressurization leak requiring emergency repairs and cleanup.
equipment_failure
small_leak
emergency_repair_and_cleanup
🚨
Major Breach
$207.3M/yr
Catastrophic failure of the high-pressure tank or major environmental release requiring full replacement, large-scale remediation and legal settlements.
structural_failure
catastrophic_depressurization
environmental_remediation
🚨
Research Breakthrough Requiring Scale Up
$22.3M/yr
Successful research leads to planned expansion: additional DOCCs, expanded lab and scaled husbandry capabilities.
breakthrough
program_scale_up
capital_expansion
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#14] Senior research staff conducting behavioral and genomic studies; rotational coverage considered. |
| Research Technician | 3 | [#14, #16] Lab techs for sample processing, sequencing prep and routine assays. |
| DOCC/ROV Operator | 2 | [#2, #17] Operators for remote-manipulation systems and internal ROVs (shift coverage). |
| Engineer / Maintenance | 2 | [#4, #5, #18] Mechanical/electrical staff for chillers, pumps, pressurization and generators. |
| Veterinarian / Marine Biologist | 1 | [#14, #27] On-site animal care, health monitoring and husbandry planning. |
| Security Officer / MTF Agent | 1 | [#13] Site security liaison/contract oversight (additional contractor staffing reflected in wages). |
Confidence Notes
Containment requires unprecedented large-volume high-pressure engineering and multiple custom systems; cost ranges are wide and dependent on major design choices (material, alternative technical mitigations). Many estimates are expert-judgment ranges rather than firm quotes, so confidence is low.