SCP-2031
Euclid
~
medium confidence
SCP-2031
Expected annual
$10.3M
One-time setup
$24.2M
Annual recurring
$10.2M
Personnel
26
Initial capital/setup costs are approximately $24.2M driven primarily by trench construction and the initial chemical fill; annual operating costs are ~ $10.15M largely driven by chemical replenishment, MTF readiness, and staffing.
One-Time Capital Costs
Total: $24.2M
Annual Recurring Costs
Total: $10.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.2M/yr
Normal-year operations with no major incidents; routine replenishment, maintenance, staffing, and monitoring only.
no breach
routine replenishment
scheduled maintenance
🚨
Minor Incident
$10.7M/yr
Localized containment issue (small trench leak, localized contamination or isolated colony breach) requiring emergency remediation and extra replenishment.
minor trench leak
small-scale escape
localized remediation
🚨
Major Breach
$15.2M/yr
Large-scale escape/outbreak requiring extensive MTF operations, aerial spraying/controlled burns, large remediation, and major environmental cleanup.
mass escape
large remediation campaign
aerial spraying/evacuation
🚨
Political Exposure
$13.2M/yr
Significant public exposure/incident leading to major legal settlements, compensation, large-scale PR/cover operations, and potentially site operational changes.
media leak
civil litigation
local government intervention
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#12] Full-time security guards for 24/7 coverage as specified (estimate from notes: 12–18; 14 used in wage calculation). |
| Security Supervisor | 3 | [#12] Supervisory staff for shifts and training coverage (2–3 supervisors indicated). |
| Research Scientist / Technician | 6 | [#13] On-site researchers and technicians (analyst midpoint of 4–8 -> 6). |
| Senior Scientist / Veterinarian | 2 | [#13] Senior scientists and veterinary support (additional senior staff noted in analyst estimates). |
| Medical Officer | 1 | [#26] On-site medic/occupational health support included in recurring medical budget. |
Confidence Notes
Midpoint-based estimates use ranges provided in analyst notes; key uncertainties involve chemical procurement method, trench liner design, regulatory regime, and breach/cleanup cost variability, so confidence is moderate rather than high.