SCP-2042
Euclid
~
medium confidence
SCP-2042
Expected annual
$1.2M
One-time setup
$735K
Annual recurring
$1.2M
Personnel
14
Initial containment and laboratory buildout are moderate (~$735k one-time) while recurring staffing, medical monitoring and research dominate ongoing costs (~$1.22M/yr). Major cost drivers are 24/7 security and research staffing, specialized HVAC/acoustic modifications, and medical/research services.
One-Time Capital Costs
Total: $735K
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with routine operations, scheduled research and no major incidents.
normal operations
routine research and maintenance
🚨
Minor Incident
$1.3M/yr
Localized containment incident requiring equipment replacement, medical treatment for staff or subjects, increased biohazard disposal and limited PR/legal actions.
single-cabinet breach
localized contamination
🚨
Major Breach
$1.7M/yr
Multiple SCP-2042-2 instances and/or SCP-2042-1 become mobile or public exposure requiring MTF deployment, large-scale repairs, replacement of containment hardware, extensive medical care and major cover-up operations.
multi-instance escape
public exposure requiring large-scale response
🚨
Political Exposure
$1.4M/yr
High-profile exposure or local-government complications requiring extended legal, PR, relocation or compensation costs.
discovery by civilians/media
local political pressure / legal action
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Round-the-clock guards (6 on staff to staff multiple shifts). |
| Site Security Supervisor | 1 | [#7] Rotating supervisor cleared for Level 2+ access. |
| Research Scientist | 2 | [#8] Neurology/behavioral/genetics principal investigators (2). |
| Research Technician | 2 | [#8] EEG/MRI coordination, behavioral testing and sample processing technicians. |
| Medical Officer | 1 | [#9] Part-time/on-call nurse/physician for monitoring altered physiology and emergencies. |
| Engineer / Maintenance | 1 | [#4, #15] Facility/ HVAC / generator maintenance and periodic refurbishment oversight. |
| Administrative Staff | 1 | [#18, #26] Admin / liaison for legal/cover story maintenance, scheduling and compliance audits. |
Confidence Notes
Notes provide detailed line-item ranges but many estimates cover wide ranges (site reuse vs new construction, research intensity, jurisdictional variance). Staffing estimates are better-defined; capital and incident costs retain moderate uncertainty.